An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Philadelphia: Top Line Summary • Deployment in Center City – 500 sites between the Delaware & Schuylkill Rivers • Convert (4) high volume, high traffic, trash collection routes from traditional trash cans to BigBelly Solar Compactors to increase operational efficiency and save $. • City’s stated goals by July 1st 2009: • 3 shifts to 1 shift • 33 people to 9 people • 17 collections per week to 5-7 collections per week • BigBelly Solar providing a turnkey solution including compactors, wireless capability, installation training, onsite service, extended warranty, an overall project management. • $12.9M in cash savings over a 10-year time period (using unburdened labor costs). • Wireless capability on the solar compactor introduces a “smart can” for long term collection of route data for greater efficiencies, verification, and further cost reductions.

  2. Philadelphia Summary on Savings • Operating cost reduction in Years 1-4 = 35% . • Operating cost reduction in Years 5-10 = 70% 2 A.R. KROPP CO & SONS • 1515-B FIFTH INDUSTRIAL COURT • BAY SHORE, NY 11706 • 631-549-9240

  3. Philadelphia Cumulative 10-Year Cash Flow Savings $12.9 $10.9 $9.3 $7.8 Millions $6.2 $4.9 $3.7 $2.8 $1.9 $813K Years 3 A.R. KROPP CO & SONS • 1515-B FIFTH INDUSTRIAL COURT • BAY SHORE, NY 11706 • 631-549-9240

  4. Driving Down Collection Costs 70% Reduction A.R. KROPP CO & SONS • 1515-B FIFTH INDUSTRIAL COURT • BAY SHORE, NY 11706 • 631-549-9240

  5. Upsides to Analysis • Not using burdened labor costs ($5M+ over 10 years in upside savings) • No revenue offsets for ad panel derived revenue from 1,000 panels on BigBelly units ($3M over 10 years at $25/panel per month assuming fully populated). • Analysis does not include cost of living adjustments for labor, vehicle maintenance or fuel increases. • Additional cost reductions will be derived through wireless functionality resulting in maximizing route efficiencies. • Grant $$ could be derived to offset lease costs. • $8M in potential savings upsides … that are not included in the base analysis.

  6. Post-Install Comments “The solar compactors have been an instant hit and a win-win for everybody. The Mayor is thrilled and we have seen a noticeable difference in so many areas including litter reduction, and increased recycling in the use of the bins. The on-time delivery schedule and implementation of the BigBelly units worked well. They are well received by the community and we have had very few problems with vandalism and graffiti.” “The project is working according to plan in terms of reducing collections while actually increasing capacity and adding recycling downtown for the first time.” “The City plans to purchase 250 more for the neighborhood commercial corridors using a beautification grant.” Mayor Michael A. Nutter Carlton Williams Deputy Commissioner Streets and Sanitation City of Philadelphia 6