CASCADING FAILURE. Ian Dobson ECE dept., University of Wisconsin USA Ben Carreras Oak Ridge National Lab USA David Newman Physics dept., University of Alaska USA. Presentation at University of Liege March 2003. Funding in part from USA DOE CERTS and NSF is gratefully acknowledged.

peta
Télécharger la présentation

CASCADING FAILURE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CASCADING FAILURE Ian Dobson ECE dept., University of Wisconsin USA Ben Carreras Oak Ridge National Lab USA David Newman Physics dept., University of Alaska USA Presentation at University of Liege March 2003 Funding in part from USA DOE CERTS and NSF is gratefully acknowledged

  2. power tail probability (log scale) -1 S -S e blackout size S (log scale) power tails have huge impact on large blackout risk. risk = probability x cost

  3. NERC blackout data15 years, 427 blackouts 1984-1998 (also sandpile data) power tail in NERC data consistent with power system operated near criticality

  4. Cascading failure; large blackouts • dependent rare events + many combinations = hard to analyze or simulate • mechanisms: hidden failures, overloads, oscillations, transients, control or operator error, ... but all depend on loading

  5. Loading and cascading • LOW LOAD- weak dependence- events nearly independent - exponential tails in blackout size pdf • CRITICAL LOAD- power tails in blackout size pdf • HIGHER LOAD- strong dependence- total blackout likely

  6. Extremes of loading log-log plot VERY LOW LOADING independent failures; pdf has exponential tail PDF blackout size TRANSITION ?? VERY HIGH LOADING total blackout with probability one PDF blackout size

  7. Types of dependency in failure of systems with many components • independent • common mode • common cause • cascading failure

  8. CASCADE:A probabilistic loading-dependent model of cascading failure

  9. CASCADE model • n identical components with random initial load uniform in [Lmin, Lmax] • initial disturbance D adds load to each component • component fails when its load exceeds threshold Lfail and then adds load P to every other component. Load transfer amount P measures component coupling, dependency • iterate until no further failures

  10. 5 component example

  11. 5 component example

  12. Normalize so that initial load range is [0,1] and failure threshold is 1 normalized initial disturbance d d = normalized load transfer p p = D - (Lfail - Lmax)Lmax -Lmin PLmax -Lmin

  13. Formulas for probability of r components fail for 0<d<1 r-1 n-r ( ) d (rp+d) (1-rp-d) ; np+d<1 quasibinomial distribution; Consul 74 n r • for np+d >1, extended quasibinomial: • quasibinomial for smaller r • zero for intermediate r • remaining probability for r = n

  14. average number of failures < r > n=100 components d p

  15. example of application:modeling load increase - • Lmax = Lfail = 1 • increase average load L by increasing Lmin 1 L - - 0

  16. example of application: • n = 100 components • P = D = 0.005 • p = d = 0.005 1 - Lmin

  17. probability distribution asaverage load L increases

  18. <r> average # failures <r> versus load L p=d and n=100

  19. example 2 of application:back off Lmax ( n-1 criterion) - Lfail = 1 k - Lmax - Lmin = 0

  20. Increase average load leads to change in d and p constant

  21. GPD formulas for probability of r components fail r-1 -rl-q • (rl+q) e / r! ; nl+q<n;r<n ; remaining probability for r = n. • For r<n agrees with • generalized Poisson distribution GPD • for nl+q>n, extended GPD: • GPD for smaller r • zero for intermediate r • remaining probability for r = n

  22. probability distribution as average load L increasesGPD model

  23. SUMMARY OF CASCADE • features of loading-dependent cascading failure are captured in probabilistic model with analytic solution • extended quasibinomial distribution with n,d,p; approximated by GPD with q=nd, l=np. • distributions show exponential or power tails or high probability of total failure; • power tail and total failure regimes show greatly increased risk of catastrophic failure • power tails when l=np=1.

  24. OPA:A power systems blackoutmodel including cascading failure and self-organizing dynamics

  25. Why would power systems operate near criticality?? • Near criticality, expected blackout size sharply increases; increased risk of cascading failure.

  26. Forces shaping power transmission • Load increase (2% per year) and increase in bulk power transfers, economics • Engineering: • new controls and equipment • upgrade weakest parts these engineering forces are part of the dynamics!

  27. Ingredients of SOC in idealized sandpile • system state = local max gradients • event = sand topples (cascade of events is an avalanche) • addition of sand builds up sandpile • gravity pulls down sandpile • Hence dynamic equilibrium with avalanches of all sizes and long time correlations

  28. Analogy between power system and sand pile

  29. OPA model Summary • transmission system modeled with DC load flow and LP dispatch • random initial disturbances and probabilistic cascading line outages and overloads • underlying load growth + load variations • engineering responses to blackouts: upgrade lines involved in blackouts; upgrade generation

  30. DC load flow model(linear, no losses, real power only) Power injections at buses P max generators have max power P Line flows F max line flow limits + F

  31. Slow and fast timescales • SLOW : load growth and responses to blackouts. (days to years)slow dynamics indexed by days • FAST : cascading events.(minutes to hours)fast dynamics happen at daily peak load; timing neglected

  32. Response to blackout by engineers For lines involved in the blackout, max increase line limit F by a fixed percentage. Also, when total generation margin drops below threshold,increase generator power limit P at selected generators coordinated with line limits. max

  33. Fast cascade dynamics • Start with daily flows and injections • Outage lines with given probability (initial disturbance) • Use LP to redispatch • Outage lines overloaded in step 3 with given probability • If outage goto 3, else stop Objective: produce list of lines involved in cascade consistent with system constraints

  34. Conventional LP redispatch to satisfy limits Minimize change in generation and loads (load change weighted x 100) subject to: overall power balance line flow limits load shedding positive and less than total load generation positive and less than generator limit

  35. Model Is the total generation margin below critical? 1 day loop Yes Secular increase on demand Random fluctuation of loads Upgrade of lines after blackout Possible random outage No A new generator build after n days LP calculation If power shed, it is a blackout Are any overload lines? 1 minute loop no Yes, test for outage Yes No outage Line outage

  36. Possible Approaches to Modeling Blackout Dynamics Complexity (nonlinear dynamics, interdependences) Model detail (increase details in the models, structure of networks,…) OPA model By incorporating the complex behavior, the OPA approach aims to extract universal features (power tails,…).

  37. OPA model results include: • self-organization to a dynamic equilibrium • complicated critical point behaviors

  38. Time evolution • The system evolves to steady state. • A measure of the state of the system is the average fractional line loading. 200 days

  39. Steady state

  40. OPA/NERC results

  41. Application of the OPA model • The probability distribution function of blackout size for different networks has a similar functional form - universality?

  42. Effect of blackout mitigation methods on pdf of blackout size “obvious” methods can have counterintuitive effects

  43. Mitigation • Require a certain minimum number of transmissionlines to overload before any line outages can occur.

  44. A minimum number of line overloads before any line outages • With no mitigation, there are blackouts with line outages ranging from zero up to 20. • When we suppress outages unless there are n > nmax overloaded lines, there is an increase in the number of large blackouts. • The overall result is only a reduction of 15% of the total number of blackouts. • this reduction may not yield overall benefit to consumers.

  45. Forest fire mitigation

  46. Dynamics essential in evaluating blackout mitigation methods • Suppose power system organizes itself to near criticality • We try a mitigation method requiring 30 lines to overload before outages occur. • Method effective in short time scale. In long time scale very large blackouts occur.

  47. KEY POINTS • NERC data suggests power tails and power system operated near criticality • power tails imply significant risk of large blackouts and nonstandard risk analysis • cascading loading-dependent failure • engineering improvements and economic forces can drive to criticality • in mitigating blackout risk, sensible approaches can have unintended consequences

  48. BIG PICTURE • Substantial risk of large blackouts caused by cascading events; need to address a huge number of rare interactions • Where is the “edge” for high risk of cascading failure? How do we detect this in designing complex engineering systems? • Risk analysis and blackout mitigation based on entire pdf, including high risk large blackouts. • Developing understanding and methods is better than the direct experimental approach of waiting for large blackouts to happen!