CHAPTER 5. ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY. INTRODUCTION . System Analysis – is a term that describes the early phases of systems development.

piercel
Télécharger la présentation

CHAPTER 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHAPTER 5 ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY

  2. INTRODUCTION • System Analysis – is a term that describes the early phases of systems development. • problem solving technique that decomposes a system into its component pieces for the purpose of studying how well those component parts work & interact to accomplish their purposes.

  3. System analysis approaches • There are 4 system analysis approaches; • Model driven analysis approach • Accelerated analysis approach • Requirements discovery methods • Business process redesign methods

  4. Model Driven Analysis Approaches • Emphasizes the drawing of pictorial system models to document & validate both existing & proposed system. • The system model becomes the blueprint for designing & constructing an improved system. • Example of software : VISIO Structures Analysis • Was one of the first formal approach for system analysis of business information system. • Used to either analyze an existing system, define business requirements for new system or both.

  5. Model Driven Analysis Approaches Information Engineering • Model driven & data centered approach to plan, analyze & design information systems. • Consists of pictures that illustrate & synchronize the system’s data & processes. • Said to be data-centered paradigm because it emphasizes the study & requirement analysis of data requirements before those of the process & interface requirements. • This is based on the belief that data is a corporate resources that should be planned & managed.

  6. Model Driven Analysis Approaches Object Oriented Analysis • Is a technique that integrates data & process concerns into constructs called objects. • Consists of pictures that illustrates the system’s objects from various perspectives such as structure & behaviour. • Unified Modeling Language (UML) provides a graphical syntax for an entire series of object models.

  7. Accelerated Analysis Approaches • Emphasize the construction of prototypes by rapidly identifying business & user requirements for a new system. • Emphasizes the interface building blocks in the information system framework by constructing sample forms & reports. • Prototype – a small scale, incomplete but working sample of desired system.

  8. Accelerated Analysis Approaches Discovery Prototyping • Uses rapid development technology to help users discover their business requirements by having them reach to quick-and- dirty implementation of those requirements. Rapid Architecture Analysis • An accelerated analysis approach that also builds a system models. • Attempts to derive system models from existing systems or discovery prototype. • It is made possible by reverse engineering technology that is included in many tools such as CASE & programming languages.

  9. Accelerated Analysis Approaches • Reverse engineering technology reads the program code for an existing database, application program, user interface & automatically generates the equivalent system model. • The resulting system model can be further edited by system analyst & users to provide a blueprint for a new & improved system.

  10. Requirement Discovery Methods • Includes those techniques to be used by system analyst to identify or extract system problems & solution requirements from the user community. Fact-finding Techniques • An essential skill for all system analysts. • Classical set of techniques used to collect information about system problems, opportunities, solution requirements & priorities.

  11. Accelerated Analysis Approaches • Fact finding techniques; • Sampling of existing documentation, reports, forms, memos • Research of relevant literature, site visits • Observation on the current system & work environment • Questionnaires & surveys of the management & users • Interviews of the appropriate managers, users & technical staffs.

  12. Business Process Redesign Methods • Business process redesign – the application of system analysis methods to the goal of dramatically changing & improving the fundamental business processes of an organization, independent of information technology. • Suitable for a study of existing business processes to identify problems & inefficiencies that is addressed in requirements for new / improved system.

  13. The Preliminary Investigation Phase • Investigation is done by system analyst to study the systems request & recommend specific action. • The analyst gathers fact about the problem / opportunity, project scope & constraints, project benefits & estimated development time & cost. • The end product of the investigation is a report to the management.

  14. Steps in the Preliminary Investigation Step 1: Understand the problem / opportunity Step 2: Define project scope & constraints Step 3: Performs fact-finding Step 4: Determine feasibility Step 5: Estimate development time & cost Step 6: Present result/recommendation to management

  15. Steps in the Preliminary Investigation Step 1: Understand the problem / opportunity • System analyst might need to develop a business profile. • Analyst will need to understand & know how the modifications will affect the business operation or system even when it’s a small alteration. Step 2: Define the project scope & constraints • Means to define boundaries/extent of the project being as specific as possible. • Projects that expands gradually without specific authorization is called = project creep

  16. Steps in the Preliminary Investigation • Types of constraints ; present, future, internal, external, mandatory & desirable. Step3: Perform fact-finding • Analyst will perform this step using various techniques such as; • Analyze organization charts – to understand how departments functions & identify the individual involved • Conduct interview – interviewing the identified individual. • Review current documentation – analyst should check whether the documentation received is accurate & complete • Observe operation – use statistic technique to check the frequency • Carry out a user survey – especially when it involves larger group.

  17. Steps in the Preliminary Investigation Step4 : Determine feasibility • To determine economic feasibility. Step5 : Estimate time & cost • To determine cost & time the following need to be addressed: • What information needed & how to gather & analyze? • Source of information to use & the constraints to use it? • How many will be interviewed & how much time & cost for it. • How much cost to alayze the information gathered & prepare final report.

  18. Steps in the Preliminary Investigation Step6 : present results & recommendations to management • If minor problem then recommendation is given without further analysis, but if the problem is big then further analysis is needed (development phase)

  19. Problem Analysis Phase • Provides the analyst a better understanding of the problems, opportunities & directives that triggered the project. • The goal of this phase is to study & understand the problem domain well enough to analyze its problems, opportunities & constraints.

  20. Steps in Problem Analysis Phase • Analyst must follow a series of steps: • Step 1 – study the problem domain • Step2 – analyze problems & opportunities • Step3 – analyze business process • Step4 – establish system improvement objectives • Step 5- update the project plan • Step 6 – present findings & recommendations to management

  21. Steps in Problem Analysis Phase • Step 1 – study the problem domain • Attempts to learn about the current system • Step2 – analyze problems & opportunities • To perform this step, project team must work with system owners & system users • Cause & effect analysis is a technique in which problems are studied to determine their causes & effects.

  22. Steps in Problem Analysis Phase • Step3 – analyze business process • Analyze business needs – to clearly define the business & system requirements. • Define business solution – IT experts define in the form of programs 7 databases, business people define in procedures to fulfill business mission. • Test business solution – evaluating whether the solution fulfills the business need. • Step4 – establish system improvement objectives • Any improvement to the system will be measured & constraints identified. Criteria for success measured in term of objectives

  23. Steps in Problem Analysis Phase • Step 5 – update the project plan • This task is triggered by completion of the system improvement objectives. • Initial project plan = input, updated project plan = output • Step 6 – present findings / recommendations • This task is triggered by the completion of the updated project plan.

  24. Requirements Analysis Phase • Defines the business requirements for a new system. • Final deliverables & milestones is to produce a business requirements statement that will fulfill the system improvement objectives.

  25. Steps in Requirements Analysis Phase • Steps are as follows: • Step 1 – define requirements • Step2 – analyze functional requirements • Step3 – trace & complete requirements • Step4 – prioritize requirements • Step5 – update the project plan • Step6 – outgoing requirement management

  26. Steps in Requirements Analysis Phase • Step1 : define requirements • A functional requirement – a description of activities & services a system must provide (input, output, stored data & processes) • Non functional requirement – description of other features, characteristics & constraints that define a satisfactory system (performance, budgets, cost) • Step2 : Analyze functional requirements • System modeling – graphical representation of concept or process that system developers can analyze, test & modify • Prototyping – creation of early working version of the information system or its components.

  27. Steps in Requirements Analysis Phase • Step3 – Trace & complete requirements • Tracing each system model / prototype back to the functional requirement to ensure all functional requirements are fulfilled. • Step4 – prioritize requirements • Timeboxing – technique that delivers information system’s functionality & requirements through versioning.

  28. Steps in Requirements Analysis Phase • Step5 : update the project plan • The completed business requirements statement completes the task, as well as the requirement analysis phase. • Step6 : ongoing requirement management • Requirement management defines a process for everyone involved in the system development that specifies how changes are to be requested & documented, how to be logged & tracked, etc

  29. Decision Analysis Phase • Identifies candidate solutions, analyses those candidate solutions & recommends a target system that will be designed, constructed & implemented.

  30. Steps in Decision Analysis Phase • Steps are as follows ; • Step1 – identify candidate solutions • Step2 – analyze candidate solutions • Step3 – compare candidate solutions • Step4 – update the project plan • Step5 – recommend a system solution

  31. Steps in Decision Analysis Phase • Step 1: identify candidate solution • System owners & users may not be directly involved in the task, but they may contribute ideas & opinions that start the task. • Step2: analyze candidate solution • Each candidate solution must be analyzed for feasibility. • 4 criteria: • Technical feasibility • Operational feasibility • Economic feasibility • Schedule feasibility

  32. Steps in Decision Analysis Phase • Step3 : Compare candidate solution • The deliverables of this task is the solutions to be recommended. If more than one solution is recommended, priorities should be established. • Step4 : update the project plan • System analyst are adjusting scope accordingly, so based on the solution recommended, analyst should re-evaluate project scope & update project plan accordingly

  33. Steps in Decision Analysis Phase • Step6 : Recommend a solution • This task is triggered by the completion of the updated project plan.