1 / 12

CONSOLIDATION CPS-BL SYSTEM

CONSOLIDATION CPS-BL SYSTEM. V. Prieto Hermosilla AB/BI/BL. OUTLINE. The CPS BL Monitoring system Functionalities Main Problems New Options: LHC-IC Test on PS Planning. PS LAYOUT. PS:100(4 SECTORS) TT2:8 nTOF:1. TOTAL BL: 164. AD:2. Injection: 6 Booster:32 (2 SECTORS) Transfer:10

pules
Télécharger la présentation

CONSOLIDATION CPS-BL SYSTEM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONSOLIDATION CPS-BL SYSTEM V. Prieto Hermosilla AB/BI/BL

  2. OUTLINE • The CPS BL Monitoring system • Functionalities • Main Problems • New Options: LHC-IC Test on PS • Planning CPS_BL SYSTEM

  3. PS LAYOUT PS:100(4 SECTORS) TT2:8 nTOF:1 TOTAL BL: 164 AD:2 Injection: 6 Booster:32 (2 SECTORS) Transfer:10 ISOLDE:10 CPS_BL SYSTEM

  4. PS BEAM LOSS • ACEM (Al Cathode Electron Multiplier Tube) • Isat=100mA (Average anode current)(6.107particles in the ACEM/10ms) • Integration mode (fixed Gain)+ADC • Integration mode +Analog acquisition. (OASIS) • -800V<Vp<-1100V • Video (display 8 bits) + Survey (read out 12 bits using 8MSB, every 100ms) CPS_BL SYSTEM

  5. MAIN PROBLEMS • Old system: 1980. • Performance limited by the electronics. • No spares for electronics/detectors. • Obsolete CAMAC Racks. • Every detector has to be dismantled and calibrated every year. • Non standard system: different from SPS and LHC. CPS_BL SYSTEM

  6. SPS (LHC) BEAM LOSS • Ionization Chamber • N2 filled • Vp=800V (1500V) • SPS integration mode (Variable Gain)+ADC(15 bits) • LHC no gain change • Survey CPS_BL SYSTEM

  7. LHC-IC TEST ON PS • Two chambers installed on the S16 of the PS (August 2007) • One in parallel with the beam pipe. • One perpendicular to the beam pipe, on the magnet. • Data taken to compare it with the actual BL system (with the same electronics or directly). • New position needs to be decided CPS_BL SYSTEM

  8. FIRST RESULTS IC1&IC2 (Direct measurement) CPS_BL SYSTEM

  9. FIRST RESULTS Electronics saturated IC1&IC2 (LHC electronics) CPS_BL SYSTEM

  10. FIRST RESULTS IC vs. ACEM with PS electronics IC vs. ACEM (direct current) CPS_BL SYSTEM

  11. NEW SYSTEM • Signal Cables: re-used with adaptors. • HV Cables : re-used (Main distribution changed on 2006) • Electronics: new (studies starts in March) • Detector: new (LHC type) • Mechanics: new (LHC type) CPS_BL SYSTEM

  12. PLANNING • We are going to install and test: • 8-16 IC’s in the PS. • LHC Electronics and Software in the b.368. • The threshold comparator program and the combiner program needs a modification but the Technical specification documenthas to be done before the software modification. • The studies for the new electronics start in March. CPS_BL SYSTEM

More Related