tamara-rodriquez
Uploaded by
12 SLIDES
244 VUES
120LIKES

Classroom Performance System (CPS)

DESCRIPTION

The Classroom Performance System (CPS) by eInstruction is a transformative technology designed to enhance student engagement and provide instant assessment of learning. This technology facilitates the collection of valuable data for differentiated instruction, intervention needs, and lesson quality evaluation. This research explores the stages of innovation development, user adoption, and the implications of CPS in varying educational settings, drawing on a comprehensive study by Boscardin et al. (2007). The findings underscore CPS's potential to positively impact classroom learning, achievement, and teacher effectiveness.

1 / 12

Download Presentation
Télécharger la présentation

Classroom Performance System (CPS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Classroom Performance System (CPS) Lori Oren, EdS candidate Diffusion and Integration of Technology in Education, EDUC 7101/8841 Walden University Dec. 31, 2009, version 1

  2. Abstract The CPS system by eInstruction is a highly beneficial technology which engages students, while instantly assessing learning.

  3. Stages of Innovation Development • Need • Research • Development • Commercialization

  4. Need: Identification and Description of CPS • The CPS is a student response system: a system of small, hand-held devices that allow students to respond to verbal or visual prompts, providing immediate feedback on individual student results, as well as data on the entire group.

  5. Need: Why CPS is a useful tool The data from CPS provides: • Information for designing learning groups for differentiated instruction • Information to determine intervention needs • Documentation on the need for redelivery of skills.

  6. Need CPS data can also be used: • To assess learning • To provide documentation of lesson quality

  7. Research (diffusion study) The research study by Boscardin, Crawford, Masyn & Penuel (2007) is representative of Roger’s (2004) consequences of innovation diffusion research. The authors (Boscardin, Crawford, Masyn, & Penuel (2007) identify the users of CPS as: • Infrequent users • those who use it for the purpose of evaluating instructional techniques • those who use it for varying purposes, but infrequently • those who use it both widely and frequently. The research therefore, fully examines the nature and use of the CPS systems. The research conducted here has implications for classroom learning, achievement, engagement, and teacher improvement.

  8. Development CPS by eInstruction

  9. Commercialization Multiple vendors manufacture and sell classroom performance systems, or audience participation systems, for business use.

  10. Rogers’ Innovation Decision Process

  11. S-curve for adoption rate

  12. References Boscardin, C., Crawford, V., Masyn, K., & Penuel, W. (2007, August). Teaching with student response systems in elementary and secondary education settings: a survey study. Educational Technology Research and Development. 55(4) 315-346. Retrieved from http://web.ebscohost.com.ezp.waldenulibrary.org/ehost/pdf?vid=15&hid=106&sid=d1a2ac71-ed15-4acf-80fe-b58d49b642c3%40sessionmgr113 CPS. (2009). eInstruction, Inc. Retrieved from http://www.einstruction.com Rogers, E. M. (2003). Diffusion of innovations (5th ed.). New York: Free Press

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer