1 / 16

WP 6: Tool Suite

WP 6: Tool Suite. www.agreement-technologies.org. WP6: Tool Suite . WP8: Tool Suite : Goal. Methodology that integrates software engineering principles for the correct management of complex and large-scale systems; and provides specific support to new requirements.

quang
Télécharger la présentation

WP 6: Tool Suite

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP 6: Tool Suite www.agreement-technologies.org

  2. WP6: Tool Suite

  3. WP8: Tool Suite : Goal • Methodology that • integrates software engineering principles for the correct management of complex and large-scale systems; and • provides specific support to new requirements. • Development environment for open MAS. From an organisational perspective (WP3)

  4. Carlos A. Iglesias cif@dit.upm.es Task 6.1 Design of a MAS Methodology based on Organisational Concepts www.agreement-technologies.org

  5. MAS Methodology: Motivation • Agents are SW, so it is need engineering' • Why another new MAS methodology? • Because most of them are “old” in a SW engineering sense • Lack of a pragmatic approach to agent engineering • Need to include current trends, such as XP, DDD, MDA, Testing, Mashups, ... • Need to research specifically on engineering with TA and social/organisational aspects • Need to research on how, when and why TA, can be integrated in current SW development

  6. MAS Methodology: Objectives • Define a methodology for “open MAS” Case studies, application projects IDE, T6.2 Life-cycle model, process model, guidelines, elicitation techniques graphical/textual notations, worksheets, documents structure Agents, TA, model-based engineering

  7. MAS Methodology: Activities • Process development (Methods)‏ • D6.1.1. Process development report (M18)‏ • Formalisation process / guidelines • Meta-models (World View + Theory)‏ • Early draft should be available (M9)‏ • Review internal/external proposals (M2)‏ • Define context / purpose of the methodology (M3)‏ • Define use cases (M5)‏ • Define models / theory (M9)‏ • D6.1.2 Report on meta-models (M24)‏ • Iterative refinement / formalisation

  8. Vicente Julian GTI-IA. UPV. Task 6.2. MAS Development Environment www.agreement-technologies.org

  9. Task 6.2. MAS Development Environment • WP6: Tool suite (Leader: V.Botti – UPV) • Task 6.1: Design of a MAS methodology based on organizational concepts (Leader: C. Iglesias) • Task 6.2: MAS Development Environment (Leader: V.Julián)

  10. Task 6.2. MAS Development Environment • Motivation • Lack of development tools and environments that support the development of open MAS • Necessity of a sw tool which integrates all the project work proposals

  11. Task 6.2. MAS Development Environment • Description • The goal of this task is to build an application development environment (ADE) that allows users to develop and execute open MAS populated with agents with agreement capabilities • There exists some previous works (EIDE, MAST, TOAST and RICAJ) which can facilitate the kick-off

  12. Task 6.2. MAS Development Environment • Activities • Study of available development tools • Definition of rules and mechanisms for translating models • Tool Development and Integration

  13. Task 6.2. Schedule M36 M0 M12 M24 M48 M60 Study of available development tools Definition of rules and mechanisms for translating models Tool Development and Integration

  14. Task 6.2. MAS Development Environment • Milestones • D6.2.1 Survey on development tools for MAS. Month 6 • D6.2.2 Rules and mechanisms for translating models. Month 24 • D6.2.3 Tool and Integrated Application development environment. Month 24, 40, 48, 60

  15. Task 6.2. MAS Development Environment • Open Issues/Challenges • Started Work • Related work study. First version available • In this year • Related work ended. Analysis and elicitation of requirements for our proposal. • Temptative: to start the transformation of the proposed models to obtain a basic non-completely functional prototype.