1 / 19

Skill Transformation for Operational Staff in Modernised Delivery Systems

Skill Transformation for Operational Staff in Modernised Delivery Systems. Geoffrey Enever Manager Customer Service Goulburn-Murray Water. WHY?. G-MW irrigation system undergoing major upgrade 100 years of Passive assets Manual operation Paper based recording

raleigh
Télécharger la présentation

Skill Transformation for Operational Staff in Modernised Delivery Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Skill Transformation for Operational Staff in Modernised Delivery Systems Geoffrey Enever Manager Customer Service Goulburn-Murray Water

  2. WHY? • G-MW irrigation system undergoing major upgrade • 100 years of • Passive assets • Manual operation • Paper based recording • Replaced with Dynamic Flume Gate regulators and automated irrigation outlets • System upgrade = Skill upgrade required

  3. Goulburn-Murray Water • and our customers • Approx 12,000 customers access water from • bores (groundwater) • direct from rivers and streams (diverters) 14,000 customers in six irrigation areas (channel network & pumped supply) • Other customers • MDBA • Other rural and urban corporations • Hydro, leases, recreation, houseboats, licences

  4. Channel automation • Majority of 6,900km channel network is manually operated • Channel automation improves control along the network • Changed operation requirements = Changed skill requirement for staff Channel network Perth Sydney

  5. Paper based records

  6. Staff well trained and knowledgeable in their field

  7. Manual operations = Large OHS risk to staff and G-MW

  8. The Project is Here! • $2.1 billion project to upgrade the gravity irrigation system • Automated/dynamic assets • Electronic components require new skills • Much of the staff knowledge & equipment now redundant

  9. Dynamic operations

  10. Electronic assets

  11. Confusion

  12. Training for staff • In house • On the job • Technical skills • Electronic equipment • 3 levels of training • Trained staff become the trainers

  13. Equipment change • Major change is the move to “In Field Computing” • Required an item suitable to conditions • User friendly for staff of varying skill levels • Large staff involvement in selection

  14. Issues - staff concerns • Ability to adapt to: • New technology • Larger geographical area of responsibility • Reduced staff numbers! • Operating “Hybrid” system • Continuing to train staff in operating a “Manual” system • Reduced contact with customers

  15. Outcomes – staff • New skills achieved • New career path • Rewarding work • Resignation of staff members! • Central System Operations • 24 hour customer contact • 24 hour system monitoring • 24 hour support to field staff

  16. So Look at G-MW Now • Central monitoring • Increased training • New Skills • New Knowledge • New Equipment • New Career • Confidence in future

  17. From Manual to Automation

  18. Summary • How it Was • Here it Is • Look at G-MW Now WIN for staff WIN for customers WIN for G-MW

  19. Thankyou for your time Contact details: geoffreye@g-water.com.au Ph: 03 58 263 633 • Questions ?

More Related