An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESENTATIONON WIND TURBINE AM by Geoffrey Weller BSc CEng FIET

  2. Introduction • ETSU-R-97 (ETSU) is failing to protect neighbours from Amplitude Modulation • ETSU is used to assess noise in planning applications. Embedded into government policy • Additional protection for AM is needed because AM may exceed maximum level quoted in ETSU • I will summarise my Proof of Evidence, add recent events, amplify previous conclusions

  3. What is AM? • To demonstrate the character of AM, I would like to play two audio files.

  4. Source: Dick Bowdler FIOA Noise Consultant

  5. Source: Recordings of Nature website • There are actually two separate recordings in this file.

  6. Proof of Evidence • The DTI commissioned the 2006 Hayes McKenzie Partnership report: The Measurement of Low Frequency Noise at Three UK Wind Farms

  7. Recent and Forthcoming Papers • From 5th International Conference on Wind Turbine Noise Denver 28-30 August 2013 • Audible amplitude modulation - results of field measurements and investigations compared to psychoacoustical assessment and theoretical research • Mike Stigwood, Sarah Large and Duncan Stigwood, MAS Environmental Ltd, UK

  8. Renewable UK Annual Conference Birmingham 5-7 November 2013 • Only 3 papers will be presented on technical issues (Session B8), all of them devoted to AM noise of Onshore Wind Turbines • RenewableUK AM Research Project – Overview of Phase 1 Research Findings • Affective Response to Amplitude Modulated Wind Turbine Sound • Mechanisms and Causes of Amplitude Modulation (AM) and Other Amplitude Modulation (OAM) of Aeroacoustic Wind Turbine Noise

  9. ETSU-R-97 • ETSU explains level of AM assumed in noise limits: This modulation of blade noise may result in a variation of the overall A-weighted noise level by as much as 3dB(A) (peak to trough) when measured close to a wind turbine. As distance from the wind turbine/wind farm increases, this depth of modulation would be expected to decrease as atmospheric absorption attenuates the high frequency energy radiated by the blade. • The term ‘as much as’ indicates the maximum level of AM envisaged, and cannot be interpreted as a typical or indicative value. It is clear that lower levels were expected at increased distance, such as at a neighbouring property

  10. Statutory Nuisance • Without any national standards for AM, it is suggested that noise problems can use the Statutory Nuisance complaint procedure via the Local Authority • To this effect, a 127-page report detailing a complete Wind Farm Noise Statutory Nuisance Complaint Methodology has been produced for DEFRA

  11. AECOM Wind Farm Noise Complaint Methodology NANR 277 120 Appendix B: Wind Farm Complaint Investigation Flowcharts – Flow Chart 1: Overall Investigation

  12. Statutory Nuisance • Difficult, lengthy, risky and expensive process • Local Authority may not act, or may be delayed by appeals. ‘Best practicable means’ defence often available • Difficulty in proving noise nuisance –noise may last many nights, then disappear entirely for a while

  13. Controls to avoid Statutory Nuisance Claims • Foreseeable harm in allowing the level of AM to be uncontrolled • Precautionary approach needed • AM Planning Condition would be win-win for developer and neighbours

  14. Conditions • Den Brook planning conditions 20 and 21 regarding AM • 3 dB limit for AM, the maximum value for AM specified in ETSU. • ETSU has has no dose-response studies, so neither does the condition • Would not inhibit properly-designed windfarms

  15. Conditions • The Den Brook planning condition was reviewed by Moroney and Constable: The Den Brook condition is straightforward and that it is possible for this condition to be employed in a transparent and objective manner to demonstrate the existence of excess AM in wind turbine noise.

  16. Challenge to the Den Brook Conditions • RES challenged the Den Brook AM planning condition – their Dr Jeremy Bass reported background noise creates false positive indications of AM • The Moroney and Constable report showed how false positives could easily be avoided by correlating data with Blade Passing Frequency • MAS Environmental analysed the data used by Dr Bass, and showed false positives caused by common noise sources that would be recorded and disregarded - bird calls, aircraft and car alarms.

  17. Conclusions • Each of the five windfarms involved in this Conjoined Public Inquiry has more turbines than Den Brook, and these are all of similar height or taller than Den Brook. • Taller and more numerous turbines leads to an increased risk of AM. • AM is likely to be worse in areas of low background noise such as Mid Wales. • Precautionary approach needed • In the absence of nationally specified controls for AM the Den Brook AM test, or another test for AM agreed by the parties involved, should be a condition of development and operation.