1 / 8

Interactions

Interactions. Autonomous Robotic Greenhouse (Phase III). Environmentally- Controlled Green- House (Phase II). Arthur Clarke Mars Greenhouse (Devon Island). Sealed Chambers (Phase I). CSA Development Greenhouse (St-Hubert). ESA -MELiSSA Higher Plant Chamber. Prototype Sealed

ravi
Télécharger la présentation

Interactions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interactions Autonomous Robotic Greenhouse (Phase III) Environmentally- Controlled Green- House (Phase II) Arthur Clarke Mars Greenhouse (Devon Island) Sealed Chambers (Phase I) CSA Development Greenhouse (St-Hubert) ESA -MELiSSA Higher Plant Chamber Prototype Sealed Greenhouse

  2. Technical Objectives • Containment • Integrated control • Autonomy • Reclamation/Recycling • Robustness/Reliability • Communications technology • Technology developments are designed to facilitate the scientific objectives of the entire project

  3. Infrastructure Requirements • Sealed chambers within the autonomous robotic greenhouse • Requires additional custom engineering • Remote, sealed greenhouse at CSA • Continued Devon Island Greenhouse infrastructure upgrades (fuel cells, wind/solar generation, control systems)

  4. Industry collaborations • Potential collaborations with: • National Instruments (data acquisition and instrument control) • Argus (environmental control) • Conviron, Angstrom Engineering

  5. Institutional Collaborations • Current collaborations exist between: • University of Guelph • Simon Fraser University • Mars Institute • Canadian Space Agency • ESA/UAB (Spain) • University of Florida • NASA

  6. Leveraging InvestmentsJan 2004 until now • $50k in cumulative investment in CESRF • $50k from OCE in Arctic greenhouse • $350k from CSA in Arctic greenhouse and CSA greenhouse

  7. Leveraging InvestmentsNow until 2009 • $1M via ESA-MELiSSA work • $500k via CSA for Arctic greenhouse, CSA greenhouse, and sealed greenhouse at CSA

  8. HQP • At least 6 graduates from Guelph • CSA will continue to support salary for at least 1 PDF, two full-time graduate students, continuous undergraduate students, and the Principle Investigator

More Related