  1. Basic Training Tile Laying System MUREXIN AG / Michael Maier Version: Oktober 2007

  2. Tile Laying System Preparation

  3. TLS - Preparation Penetrating Primer LF • for absorbent substrates • ready-to-use • one component • solvent free • Consumption: appr. 0,15 kg/m² • Delivery units: 1 and 5 kg • Drying time: approx 30 minutes • Application: with brush, roller

  4. TLS - Preparation Penetrating Primer LF 1 – Application:

  5. TLS - Preparation Penetrating Primer LF 1 – Application:

  6. TLS - Preparation Penetrating Primer LF 1 – Pull off strength: without Penetrating Primer LF 0,45 N/mm² with Penetrating Primer LF 1,15 N/mm²

  7. TLS - Preparation Sealing Compounds • for indoor and outdoor use • for indoor use Liquid Sealing Compound 1KS Liquid Sealing Compound 2 KS Sealing Compound DF 2K Profi Sealing Compound PD1K

  8. TLS - Preparation Liquid Sealing Compound 1 KS • seam- and jointless sealing compound • protect against pressureless water • Solvent free • one component • only for indoor use • Consumption: appr. 1,5 kg/m²/mm • Delivery units: 7, 14 u. 25 kg • Application: roller, trowel, • Drying time between 1st and 2nd layer: 1 hour • Drying time between 2nd layer and tiling: appr. 3 hours

  9. TLS - Preparation Sealing Compounds – System components Sealing Collars DZ 35 / DZ 70 • Sealing Tape DB 70 • 10 and 50 lfm per roll Sealing Corners

  10. Tile Laying System Application

  11. Application Liquid Sealing Compound – Application: Penetrating Primer LF 1 (drying time approx 30 minutes)

  12. Application Liquid Sealing Compound – Application: 1st step Fix the Sealing Ribbon DB 70 in the corners Apply liquid sealing compound 1 KS with roller or trowel only in the corner (with approx 10 cm) and fix the sealing tape into the fresh insulation. Same process with the sealing collars

  13. Application Liquid Sealing Compound – Application: Liquid Sealing Compound 1 KS Application with roller

  14. Application Liquid Sealing Compound – Application: Liquid Sealing Compound 1 KS

  15. Application Liquid Sealing Compound – Application: Liquid Sealing Compound

  16. Application Liquid Sealing Compound – Application: Liquid Sealing Compound

  17. Application Liquid Sealing Compound – Application: Liquid Sealing Compound

  18. Timetable Product applying with Penetrating primer LF 1 roller, prush Drying time approx 30 minutes 1st layer liquid sealing compound 1 KS roller, trowel, Drying time approx 1 hour 2nd layer liquid sealing compound 1 KS roller, trowel, Drying time approx 3 hours Tiling with Flex Tile Adhesive f. e. Murexin Flex tile adhesive KGF 65, C2 TE, s1