html5-img
1 / 44

Mississippi River Bridge An Analysis of Alternatives

Mississippi River Bridge An Analysis of Alternatives. Expert Panel Review. Sharon Greene & Associates. Agenda. Purpose and Need for New Bridge Existing Conditions Definition of Alternatives Comparison of Alternatives. Purpose of Project.

Télécharger la présentation

Mississippi River Bridge An Analysis of Alternatives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mississippi River BridgeAn Analysis of Alternatives Expert Panel Review Sharon Greene & Associates

  2. Agenda • Purpose and Need for New Bridge • Existing Conditions • Definition of Alternatives • Comparison of Alternatives

  3. Purpose of Project “The purpose of the proposed action is to relieve increasingly severe traffic congestion and reduce traffic crashes on downtown St. Louis-area Mississippi River crossings, especially on the Poplar Street Bridge (I-55/70/64), thereby avoiding economic stagnation at the core of the region.” Source: Mississippi River Crossing: Relocated I-70 and I-64 Connector, Final Environmental Impact Statement, March 2001.

  4. Need for Project • Improve travel capacity and travel efficiency • Improve system linkages and community access • Reduce traffic crashes • Reduce travel times • Avoid economic stagnation Source: Mississippi River Crossing: Relocated I-70 and I-64 Connector, Final Environmental Impact Statement, March 2001.

  5. Existing Downtown Crossings McKinley Bridge ML King Bridge Eads Bridge Poplar Street Bridge

  6. Existing Conditions: Daily Crossings Source: Mississippi River Crossings: Average Daily Traffic History, Illinois Department of Transportation.

  7. Existing Conditions:Downtown AM Peak Westbound Destinations 3,877 (35%) 1,762 (16%) 10,964 TotalPeak Hour Trips CBD I-70 Mississippi River 3,847 (35%) I-64 I-55 Source: Mississippi River Crossings: Overview of Travel Patterns, East-West Council of Governments, September 2005. N 1,478 (13%)

  8. Existing Conditions:Poplar AM Peak Westbound Destinations 979 (14%) CBD 463 (7%) 6,767 TotalPeak Hour Trips I-70 Mississippi River 3,847 (57%) I-64 Poplar I-55 Source: Mississippi River Crossings: Overview of Travel Patterns, East-West Council of Governments, September 2005. N 1,478 (22%)

  9. Existing Conditions:All Downtown Crossings by Vehicle TypeAM Peak, Westbound Destinations Source: Special Traffic Counts, East-West Council of Governments, December 2006.

  10. Existing Conditions:Poplar Street Crossings by Vehicle TypeAM Peak, Westbound Destinations Source: Mississippi River Crossings: Overview of Travel Patterns, East-West Council of Governments, September 2005.

  11. Existing Conditions:Poplar Street Crossings by Vehicle Type: Off-Peak OnlyWest bound Destinations Source: Mississippi River Crossings: Overview of Travel Patterns, East-West Council of Governments, September 2005.

  12. Alternatives Under Consideration McKinley Bridge Proposed IL-3 Proposed MRB Proposed I-64 Proposed Coupler Bridge ML King Bridge Eads Bridge Poplar Street Bridge

  13. MRB: No Connections • Landside Improvements: None • Capital Cost Estimate: $999.2M (YOE) • Proposed Schedule: 2009-2014 • NEPA Status: ROD proposed 2007 • Potential Committed Funding: • SAFETEA-LU Earmarks: $239M • Additional IDOT Funding: $210M • Tolling Considered: Yes Proposed MRB

  14. MRB: With I-64 Connector • Landside Improvements: I-64 Connection • Capital Cost Estimate: $1,561.5M (YOE) • Proposed Schedule: 2009-2014 • NEPA Status: ROD proposed 2007 • Potential Committed Funding: • SAFETEA-LU Earmarks: $239M • Additional IDOT Funding: $210M • Tolling Considered: Yes Proposed MRB Proposed I-64

  15. MRB: With I-64 and IL-3 Connections • Landside Improvements: I-64 Connection and IL-3 Connection • Capital Cost Estimate: $1,762.5M (YOE) • Proposed Schedule:2009-2014 • NEPA Status:ROD proposed 2007 • Potential Committed Funding: • SAFETEA-LU Earmarks: $239M • Additional IDOT Funding: $210M • Tolling Considered: Yes Proposed IL-3 Proposed MRB Proposed I-64

  16. MLK Coupler Bridge • Landside Improvements: None • Capital Cost Estimate: $545.9M (YOE) • Proposed Schedule: 2012-2014 • NEPA Status: Not Analyzed • Potential Committed Funding: • SAFETEA-LU Earmarks: $239M • Additional IDOT Funding: $210M • Tolling Considered: No Proposed Coupler Bridge

  17. Comparison of Alternatives • Congestion Reduction • Network Connectivity • Travel Time Savings • Regional Economic Development Impacts • Potential for Revenue Generation

  18. Congestion Reduction:2020 Traffic Volume Comparison 391,378 392,079 391,828 391,232 391,346 391,254 391,220 381,755 371,705 246,400 246,248 242,625 234,238 233,609 230,861 230,135 232,368 214,358 Source: East-West Gateway Council of Government Travel Demand Model Run

  19. Congestion Reduction:2020 Traffic Volume Comparison Source: East-West Gateway Council of Government Travel Demand Model Run

  20. Congestion Reduction:2020 AM Westbound Volume to Capacity (V/C) Ratio Source: East-West Gateway Council of Government Travel Demand Model Run

  21. Congestion Reduction:2020 PM Eastbound Volume to Capacity (V/C) Ratio Source: East-West Gateway Council of Government Travel Demand Model Run

  22. Travel Patterns MRB: All Connections

  23. Internal/External Trips Analysis:New MRB Source: East-West Gateway Council of Government Travel Demand Model Run

  24. Internal/External Trips Analysis:Poplar Street Bridge Source: East-West Gateway Council of Government Travel Demand Model Run

  25. Internal/External Trips Analysis:Change on Poplar Street Bridge Source: East-West Gateway Council of Government Travel Demand Model Run

  26. Annual Travel Time Savings:All Bridges Source: East-West Gateway Council of Government Travel Demand Model Run

  27. Average Travel Time for AM Westbound Trips:Poplar, New MRB, and MLK Bridges Source: East-West Gateway Council of Government Travel Demand Model Run

  28. Average Travel Time Between Key Origins and Destinations

  29. Average Travel Time Savings Source: East-West Gateway Council of Government Travel Demand Model Run

  30. Average Travel Time Savings Source: East-West Gateway Council of Government Travel Demand Model Run

  31. Average Travel Time Savings Source: East-West Gateway Council of Government Travel Demand Model Run

  32. Average Travel Time Savings Source: East-West Gateway Council of Government Travel Demand Model Run

  33. Regional Economic Development Impacts • Little definitive data is available • Business community forecasts show positive impacts in qualitative terms • Changes in the rate of growth and traffic within the region over the last 10 years raises issues related to economic growth: • Will a new bridge spur new net growth, and hence contribute positively to the region’s economy? • Will the absence of a new bridge hinder potential growth with an inherent negative impacts on the region’s economy?

  34. Potential Toll Revenue Generation • Toll Diversion Rates • Assumptions • Potential Revenue Generation • Potential Funding Scenario

  35. Estimated Toll Diversion Rates:Travel Demand Model Results Source: East-West Gateway Council of Government Travel Demand Model Run

  36. Potential Toll Bond Revenue Generation: Assumptions • Weekend traffic levels: 0.5 * weekday levels • Annualization Factors • Weekday: 250 • Weekend: 115 • Toll Rate Scenarios: • $1 Auto / $3 Truck • $2 Auto / $4 Truck • Annual O&M Cost:10% of Annual Toll Revenue • Debt Coverage Level: 1.4 • Bond Amortization: 30 years @ 5.75%

  37. Potential Toll Bond Revenue Generation Estimate:Travel Demand Model Results (in millions)

  38. Potential Funding Scenarios:Travel Demand Model Results

  39. Potential Funding Scenarios:Travel Demand Model Results

  40. Potential Toll Bond Revenue Generation: Additional Consultant Assumption • $1 Auto / $3 Truck Diversion Rate = 50% • $2 Auto / $4 Truck Diversion Rate = 70%

  41. Potential Toll Bond Revenue Generation Estimate:Consultant Assumption (in millions)

  42. Potential Funding Scenarios:Consultant Assumptions

  43. Potential Funding Scenarios:Consultant Assumptions

  44. Questions?

More Related