ERCOT Public. Network Model Management System. Project began in 2003 with plans to:Reduce man hours required to load a new model.Improve model accuracy with additional checks.Improve Planning and Operations model consistency.Improve data submittal interface between ERCOT and Market Participants.

rory
Télécharger la présentation

Network Model Management System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. ERCOT Public Network Model Management System

    2. ERCOT Public Network Model Management System Project began in 2003 with plans to: Reduce man hours required to load a new model. Improve model accuracy with additional checks. Improve Planning and Operations model consistency. Improve data submittal interface between ERCOT and Market Participants. Improve model change audit trail metrics. Improve links between the Model and Outage Scheduler.

    3. ERCOT Public Network Model Management System Re-directed project in late 2005 to ensure compliance with Nodal Protocol requirements. Challenges in Nodal Protocol: Model timeline Data consistency between models CRR auction data requirements Information posting

    4. ERCOT Public Proposed NMMS Solution

    5. ERCOT Public Network Model Management System Proposed Immediate Timeline Provide NMMS Business Requirements to TPTF in 2/2006 Start Functional Specifications in 3/2006 Start Design for Service Requests Redesign in 3/2006 Return to TPTF in 5/2006 with Design Specs