ryu
Uploaded by
1 SLIDES
182 VUES
10LIKES

TDG project timeline and roadmap

DESCRIPTION

TDG project timeline and roadmap. Integration and interfacing of software. Single-station field tests. Dual-station field tests. Working Prototype. Design (Florida). Demo BZE. Demo DR. BZE. DR. Integration (Pittsburgh). Transnational tests. 2004. 2005. 2006.

1 / 1

Télécharger la présentation

TDG project timeline and roadmap

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. TDG project timeline and roadmap Integration and interfacing of software Single-station field tests Dual-station field tests Working Prototype Design (Florida) Demo BZE Demo DR BZE DR Integration (Pittsburgh) Transnational tests 2004 2005 2006 First bare-bones working system need networks, transnational practices overall design and its components extend capabilities, DR/Belize field work (focus groups, feedback)

More Related