Integrated Resource Planning (IRP) -- a tool for Lao power sector planning? Lessons from the USA Pacific Northwest. Chris Greacen Vientiane, Lao 5 March 2013. Lao. Outline. A brief history of the power sector in Pacific Northwest of USA Integrated Resource Planning (IRP) What is it?

sahkyo
Télécharger la présentation

Chris Greacen Vientiane, Lao 5 March 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrated Resource Planning (IRP) -- a tool for Lao power sector planning? Lessons from the USA Pacific Northwest Chris Greacen Vientiane, Lao 5 March 2013

  2. Lao

  3. Outline • A brief history of the power sector in Pacific Northwest of USA • Integrated Resource Planning (IRP) • What is it? • What steps are involved? • Example: IRP and energy efficiency in the Pacific Northwest

  4. A Brief POWER SECTOR HISTORY of thePACIFIC NORTHWEST usa

  5. Columbia River salmon catch

  6. History of Integrated Resource Planning • Pre-1980, utilities used “straight-line” load forecasts (a ruler) to make resource decisions

  7. Straight-line demand forecasting led to huge financial commitments to very large power plants

  8. IRP History-con’t. • Utilities and regulators ask, “Is there a better way?” • 20 Years ago WUTC adopted rules to require investor-owned utilities to prepare a Least Cost Planning or “Integrated Resource Plan (IRP). • consider demand elasticity • consider demand side resources

  9. As of 2011, 39 States Require IRP Source: Wilson & Pederson, 2011. A Brief Survey of State Integrated Resource Planning Rules and Requirements

  10. What is Integrated Resource Planning (IRP)? Simply put, IRP means meeting power sector objectives at the lowest cost. • Consider a range of different options • Include all costs (generation, transmission, social & environmental costs) • Chose option the provides best benefit at lowest cost/risk profile

  11. Objectives Defined IRP Flowchart ITERATION Data collection, systems analysis Demand forecast scenarios (by end use) Meeting electricity requirement: options T&D IMPROVEMENTS END-USE EFFICIENCY IMPROVEMENTS GENERATIONPLANTS UNIT COSTS OF ALTERNATIVES ($ / kWh) GWh YEAR B A C LEAST COST MIX $/kWh GWh Strategies Periodic Monitoring Source: D’Sa, A. (2005). "Integrated resource planning (IRP) and power sector reform in developing countries." Energy Policy 33(10): 1271-1285. Implementation

  12. Source: Puget Sound Energy

  13. “Full Featured” IRP status • the state IRP process is required by law • the process is subject to public review; • regulators require integration of construction permit and utility ratemaking processes with the IRP process

  14. Example: IRP and energy efficiency in the Pacific Northwest • IRP objective: minimize cost to meet growing electricity demand

  15. 2006 Resource Mix WA State Office of Trade & Economic Development http://www.energy.cted.wa.gov/FuelMixDisclosure.htm

  16. Variation in Hydro Generation

  17. Cost comparison for different resource options in Pacific Northwest, USA Source: Northwest Power and Conservation Council, 5th Plan.

  18. T-5 Insulate roofs to keep cool in

  19. Source: The 5th NW Electric Power and ConservationPlan Supply options in NW USA

  20. Source: The 5th NW Electric Power and ConservationPlan Supply options in NW USA

  21. Pacific NW: meeting growing demand through mainly investments in RE and EE Source: Northwest Power and Conservation Council

  22. Source: Charles, Gillian and Tom Eckman. 2010. Regional Conservation Progress Report – Results from 2010. Regional Technical Forum. http://www.nwcouncil.org/energy/rtf/consreport/2010/Default.asp

  23. Cost of new conservation less than $0.02/kWh Source: Charles, Gillian and Tom Eckman. 2010. Regional Conservation Progress Report – Results from 2010. Regional Technical Forum. http://www.nwcouncil.org/energy/rtf/consreport/2010/Default.asp

  24. Lessons Learned – Power System Planning • Energy Efficiency Reduces System Cost and Risk • Efficiency Resources Are A Low Cost (avg. 2.4 cents/kWh) Hedge Against Market Price Spikes • They’re Not Subject to Fuel Price Risk • They’re Not Subject to Carbon Control Risk • They Can Be Significant Enough In Size to delay “build decisions” on more expensive and higher risk generation • It takes REAL MONEY, DATA and ANALYSIS to properly size efficiency resources • Northwest invested about $14 per capita in 2005 acquiring efficiency, several other US states are spending more

  25. For more information Chris Greacen Palang Thai chris@palangthai.org www.palangthai.org

  26. Laos: Candidate IRP questions • What is quickest and/or most cost-effective way to provide basic electrical services to the people without electricity? • What is the most cost-effective way to meet current and growing needs for electricity in the country (industrial, commercial, residential)? • What is Laos’ optimum strategy for power export?

  27. IRP-inspired group activity • Three tables • Rural electrification • Meeting domestic demand • Power export • ?

  28. At each table… • Situation in a few sentences • Resources (demand and supply side) and costs • Scenarios • Indicators for monitoring whether objectives are being met

  29. Thank you! Chris Greacen Palang Thai chris@palangthai.org www.palangthai.org

  30. IRP “Efficient Frontier” From the Northwest Power and Conservation Council – Fifth Power Plan, May 2005

  31. Lao power system objectives