Sarasota- Manatee Traffic Management Center Coordination with Partnering Agencies TRANSPO 2012

Sarasota- Manatee Traffic Management Center Coordination with Partnering Agencies TRANSPO 2012. Presented by: SAGE KAMIYA, P.E., PTOE DEPUTY DIRECTOR, TRAFFIC MANAGEMENT PUBLIC WORKS DEPARTMENT. Traffic Management Center. SARASOTA-MANATEE TMC. INTELLIGENT TRANSPORTATION SYSTEMS.

sailor
Télécharger la présentation

Sarasota- Manatee Traffic Management Center Coordination with Partnering Agencies TRANSPO 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sarasota- ManateeTraffic Management CenterCoordination with Partnering Agencies TRANSPO 2012 Presented by: SAGE KAMIYA, P.E., PTOE DEPUTY DIRECTOR, TRAFFIC MANAGEMENT PUBLIC WORKS DEPARTMENT

  2. Traffic Management Center SARASOTA-MANATEE TMC

  3. INTELLIGENT TRANSPORTATIONSYSTEMS ARTERIAL MANAGEMENT FREEWAY MANAGEMENT CRASH PREVENTION ROAD WEATHER MANAGEMENT TRANSIT MANAGEMENT TRAFFIC INCIDENT MANAGEMENT EMERGENCY MANAGEMENT TRAVELER INFORMATION

  4. MANATEE ATMS PROJECTS PHASE I 143 SIGNALS PHASE II 88 SIGNALS • 231 Signal Cabinet Upgrades • 58 CCTV Monitoring Cameras • 60 Vehicle Detection System Devices • Includes Cities of Bradenton and Palmetto • Includes communication hub for Sarasota County ATMS

  5. 365 Signal Cabinet Upgrades • ~100 CCTV Monitoring Cameras • 26 Vehicle Detection System Devices • Includes Cities of Sarasota, Venice, and North Port

  6. TMC CONTROL ROOM

  7. BACKGROUND • Sarasota Manatee MPO lead • Identified stakeholders • Outlined an ITS framework for the logical and physical architectural of regional ATMS • Included high level design and implementation plan • 2004 FDOT Concept of Operations • 2005 Interlocal Agreement - Unified Regional Intelligent Transportation System

  8. IMPLEMENTATION • Intelligent Transportation Systems Management Team • Proportionate cost share based on population • Defined responsibilities • Shared training • Technical integration meetings

  9. FUNDING • Manatee County – Work Program Funds/ ARRA • Sarasota County – Local and TRIP funds • Operations – Congestion Management Funds? • FDOT Support

  10. GOALS • Fewer stops and less stop time at traffic signals • Respond to traffic disruptions immediately • Improve response time for Emergency vehicles and improve bus service reliability • Improve emergency evacuations • Improve safety by providing real time traffic information

  11. PERFORMANCE MEASURES TRAFFIC INCIDENT MANAGEMENT TRAFFIC SIGNAL MAINTENANCE ARTERIAL MANAGEMENT • Operations Performance Measures • Travel time reliability/consistency • Travel time (before and after improvements) • Reduction in delay • Vehicle Throughput

  12. PERFORMANCE MEASURES TRAFFIC INCIDENT MANAGEMENT TRAFFIC SIGNAL MAINTENANCE ARTERIAL MANAGEMENT • Maintenance Performance Measures • Percentage of operational vehicle detection devices • Percentage of operational pedestrian detection devices • Proactive identification of malfunctions (percentage)

  13. LESSONS LEARNED • Clearly Defined Goals • Staff Continuity • Communication • Funding Sources

  14. THANK YOU SAGE KAMIYA, P.E., PTOE DEPUTY DIRECTOR, TRAFFIC MANAGEMENT MANATEE COUNTY PUBLIC WORKS DEPARTMENT E-Mail: sage.kamiya@mymanatee.org 14