An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AIM FRB BriefingStrategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08

  2. Use of Traditional AIM I LP/TG Content • ILT materials are maintained in Central Site AIM I, which is hosted by NAVAIR Orlando. • Courses are exported to SCORM V1.2 and imported into Elite.

  3. Top Five AIM Change Requests (ACRs) • 1. AIM-I-2003-002: Add RRL, OAC, and FAL to HTML output. • 2. AIM-I-2004-003: Add ability to create changes to RRL items. • 3. AIM-I-2007-001: Include TG graphics that were embedded in Word in SCORM output. • 4. AIM-I-2008-002: Allow simultaneous editing of TCCD, COI, and LP/TG. • 5. AIM-I-2008-004: Add Developing Authority functionality to LO module.

  4. Electronic Classroom and ILT Delivery • All ECs are connected to a central server, which contains the Elite courses, IETMs, IMIs, and Training Assets Menu. • The EC Instructor stations are dual-monitored for simultaneous viewing presentation materials and staging of materials for broadcast to Student stations. • Materials are sent to Student stations from the Instructor station using Robotel.

  5. JTA/NJA Data and Process SME Panel (SME, SLC, TYCOM, SSP, Fleet) Develops integrated OCCSTDS/NJA OCCSTDS WG Pulled NJA data out and created OCCSTDS update OCCSTDS Review/ Approval Process Reviewed and approved SSP and SLC SSP has: • Revised OCCSTDS • Re-developed NJAand OCCSTDS • Uploaded NJA intoCPM (R&D site) from Excel spreadsheets • Sent refreshed OCCSTDS for NAVMAC review MT 3 OCCSTDS Operator NJA Skill Group (KSAs) Tasks (KSAs) Subtasks (KSAs) Steps (KSAs) Functional Area Tasks MT 2 OCCSTDS Functional Area Tasks MT 1 OCCSTDS Technician NJA Functional Area Tasks MTC OCCSTDS Manager NJA Functional Area Tasks

  6. ILE Projects and CPM/LO Module • MT Continuum • MT Continuum Overview • Development Process

  7. MT Continuum Development Process

  8. NJA Excel COI/ISD Word Doc MT Continuum Development Process

  9. MT Continuum Process Lessons Learned • Need to be able to update AIM data with changes made in final development (As Designed = As built) for maintenance of content. • AIM automatic metadata needs better definition process to make more effective. • Must have a “GOTS” product do the “finishing work”—or else minor changes require going back to developer EVEN if you have the source files. • Need a Configuration Management toolset to control final product AND source files. (CMAD did NOT do this, and now no toolset is planned to accomplish).

  10. Top Five AIM/CPM FRM Items • 1. (Multiple FR items): Change Compare Report – surveillance needs are high and more costly than initial development. • 2. (Multiple FR items): Work flow (approval) – ensures CM. • 3. (4.2.4.3): Import open XML into LO Module from other applications – supports maintaining as designed data (LO Module) = as built data (other app). • 4. (4.2.4.9): Import option to overwrite existing material or not – supports maintenance. • 5. (4.2.3.41): Build NLOS from existing NLOS and maintain links to existing content AND utilize the same ELO in LO Module – supports content re-use

  11. Points of ContactJamie Swaim703.313.0360 or jamie.swaim@sp15.chenegafederal.comRichard Garrison301.685.3275 orrichard@garrisonconsulting.biz