An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective AOP01.2

  2. Objective AOP01.2 • Comprehensive Explanation • Link to European ATM Master Plan • Most important SLoA(s) • Finalisation Criteria and Closed Questions • Supporting Material • ESSIP Report 2012 • Objective Coordinator’s Analysis, recommendations, tips & tricks • Conclusions • Links and contacts September 2013

  3. Comprehensive Explanation Implement airside capacity enhancement method and best practices based on Eurocontrol capacity and efficiency implementation manual • This objective aims at implementing a collaborative capacity enhancement method that releases possible airside capacity improvement areas, to enable the implementation of suitable European best practices to unlock latent airside capacity • The applicability area is presented in Annex B of the ESSIP Plan Edition 2013 document; • Initial operational capability - 01/2007, Full operational capability - 12/2013 September 2013

  4. Link to European ATM Master Plan • [AO-0305]-Additional Rapid Exit Taxiways (RET) and Entries; • [AUO-0701]-Use of Runway Occupancy Time (ROT) Reduction Techniques. September 2012

  5. Most important SLoA(s) • APO01 - Establish an Airside Capacity Enhancement (ACE) Steering Group. This SLoA is related to the establishment of a Steering Group consisting of senior managers from the Airport Operators, Local Airlines and ANSPs; • APO02 - Conduct annual assessment of future capacity requirements; • APO03 - Collect and analyze capacity and performance data; • APO05 - Develop and Implement a commonly agreed local action plan. September 2013

  6. Most important finalisation Criteria • APO01: Airside Capacity Enhancement (ACE) Steering Group established and effective; • APO02: Annual capacity assessments completed; • APO03: Capacity & Performance Data collected and analyzed; • APO05: Commonly developed action plan approved and implemented; September 2013

  7. Supporting Material • EUROCONTROL-Airside Capacity Enhancement (ACE) Implementation Manual, Edition 1.0, dated 14.10.2003 Url : http://www.eurocontrol.int/airports/public/standard_page/ace_library.html; • EUROCONTROL-Measurement of Pilot Reaction times and Runway occupancy times - The complete Guide Url : http://www.eurocontrol.int/airports/public/standard_page/ace_library.html; • EUROCONTROL-Network Operation Plan (NOP) Programme Url : http://www.cfmu.eurocontrol.int/cfmu/public/standard_page/nos_work_programme_nop.html September 2013

  8. ESSIP Report 2012 September 2013

  9. Objective Coordinator’s Analysis, recommendations, tips & tricks • Information/data are missing for some of the airports within the applicability area. • More elaborate explanation about progress assessment is required. September 2013

  10. Links and contacts • Objective Coordinator: Predrag Vranjkovic, +32 2 729 3257 predrag.vranjkovic@eurocontrol.int • DNM Objective Expert: Paul Adamson, +32 2 729 5183 paul.adamson@eurocontrol.int September 2013