Energy-efficiency in IPPC permitting

Energy-efficiency in IPPC permitting. a challenge to the licensor by Gerard Roukens RouCo B.V. (NL). UBA conference, Vienna, 21/10/2004. 1. Licensor’s raison d’ ètre. Guard over safe and sound conduct Executing IPPC & BREF

sanaa
Télécharger la présentation

Energy-efficiency in IPPC permitting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Energy-efficiency in IPPC permitting a challenge to the licensor • by • Gerard Roukens • RouCo B.V. (NL) UBA conference, Vienna, 21/10/2004 1

  2. Licensor’s raison d’ètre • Guard over safe and sound conduct • Executing IPPC & BREF • However: • - silently stripped of authorities • - new instruments -> BAT on the decline 2

  3. New Instruments • NOx trading • CO2 trading • EE benchmarking Equivalent to BAT? 3

  4. Efficiency definitions ??? • CO2 trading in IPPC  • discard BAT on efficiency? • E-efficiency • C-efficiency • G-efficiency 4

  5. Gas engine (example) 5

  6. Lean-burn gas engine HC/CO emissions CO: cold walls CH4 + O2  CH2O + ………formaldehyde C2H6 + O2  C2H4O + ……acetaldehyde CH4 + O2  C2H4 + ………ethene CH4 + O2  CO + ………..carbonmonoxide CH4: unreacted, misfiring, crevices…..methane (gas slip) piston ‘Traditional’ emission profile ) CH4: 300 g/GJ (1,65% gas slip) C2H6 30 g/GJ C2H4 15 g/GJ CH2O 10 g/GJ C2H4O 1 g/GJ CO 150 g/GJ Note: large advanced engines have tendency towards much higher HC emissions. *) within a wide spread 6

  7. LB gas-engine cogen: electr 42 % total 90 % E-efficiency vs. G-efficiency(example) Seperated generation CC-plant: electr 56% Gas boiler: heat 90% Fuel saving 22%  CO2 reduction 22% 5% methane slip at engine: emission in CO2-equiv is equal 7

  8. Getting aquainted with the licensor • E-efficiency: a new and difficult subject ! • Can the licensor deal with it? He is already overworked and swamped in rules, regulations, procedures etc. Does he recognize, for instance,.….(next slide) 8

  9. Basic Thermodynamics Carnot cycle in the Mollier-diagram The basic Rankine cycle 9

  10. Basic Thermodynamics Rankine cycle with single reheat Brayton-Rankine combined- cycle 10

  11. PC-plant efficiency • LHV 100% • Ash-removal, stack & radiaton losses 8% • Available heat 92% • Cycle eff. 49% gross output 45% • Internal use 2,5% pt net output 42,5% • Transmission 2% ptend-use40,5% • Performance rating: very good 11

  12. Advanced Power Plants PC plant  ~ 46% net electr. efficiency (super-critical, double reheat) CO2 capture + compression: electr  10% pt, yet economic for EOR Combined cycle: net base-load eff 58+ % (Baglan Bay / GE H-type GT) Repowering existing plants en-vogue. NL experience: topping with GTs  electr  6 % pt 12

  13. Elsam Kinder Morgan CENS Project • CO2-Emission reduced by 90 % • SO2-Emission capture is 99+ % • NOx-Emissions reduced by 85 % • Cost of capture < $25 /tCO2 CO2-Norway Capturing CO2 from Coal-Fired Power 13

  14. Elsam Kinder Morgan CENS Project CO2-Norway Capturing CO2 from Coal-Fired Power 14

  15. Back to the licensor • Subject is complex! • Qualifications licensor? • IPPC-Brefs? BAT by 2007? • Not across the fence! 15

  16. Example of ‘not across the fence’ • New CC plant • Adjacent facility operates old boiler • No big deal cut no cogeneration • Small stm-line / duct-burner + stm letdown 16

  17. Energy efficiency benchmarking? • Req’mnt: comply with world-top (e.g. best 10%) • Seemingly fair • However: process is tedious, problems numerous, results debatable Simple truth: EE belong to the best-kept secrets; thus, hard to extract. 17

  18. Organisational aspects: 1. A non-public expert body  facilitator  Some problem areas (1) Tensions / confusion regarding responsibilities & specific tasks relative to licensor. 2. Process transparency and public access to meaningful information difficult to ensure. 18

  19. Some problem areas (2) • Methodological aspects: • Product-slate & feedstock (variable or special) • Plant BL (uncertain) • Multi-plant facility (averaging eff?) • Value of electricity & other en. carriers (reference plants) • Savings by cogen (to steam?) • Masking bad process efficiency thru cogen • Limited benchmark (few plants or low response) 19

  20. Some problem areas (3) • Re. power plants: • World  not one level playing field • Plant-size counts • Load-factor counts • Reliable annual efficiencies hard to get estimated cycle efficiencies unacceptable Note: In Holland: Industry’s Kyoto targets unlikely to be realized by BM; for a major province ave. efficiency in 2000 already at level of ‘world-top’ for 2013. 20

  21. Hope for the licensor? • Yes! • The EIA stipulated by EC-directive 85/337 • Strong by amendments 1997 & 2003: • Virtually all activities covered • Plant modifications also covered • Public information secured (Aårhus) • Explicit about contents of EIA, e.g. factor climate, long-term effects, alternatives, envisaged measures EU-BREFs fit in well! (integrated approach) EIA-update to be pursued for periodic license update. 21

  22. Economics: a trade to be mastered • Efficiency measures give revenues, not only costs. • Investments are based on: Internal Rate of Return on Equity (IRQ) • Loans affect IRQ favorably (risk-sharing in volatile market) • Criterion: 10 – 12% IRQ, after tax (refer example next) 22

  23. 400 MW PC-plant Investment 400 mln € Coal-price 25 €/ton 1) Price of Electricity [€/MWh] 30 2) 33 pre-tax post-tax pre-tax post-tax IRQ (100% equity) % 12,3 9,7 14,9 11,7 IRQ (50% equity) % 15,4 12,7 19,6 15,8 • Due to weakening dollar and oil-price turmoil, the coal-price has skyrocketed over the last eighteen months, up to 50-55 € /ton. • PoE to be increased by 2,5% per 10% rise in coal-price to maintain constant IRQ. IRQ for PC power plant Simulation on a 400 MW super-critical / super-clean PC plant, recently built. 23

  24. The EndThank you for listening…. 24

More Related