90 likes | 328 Vues
Brentwood Union Free School District. 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates. April 19, 2007. Prepared by:. Brentwood UFSD. Pool Phase “Ross House Pool”. Bids have been received from all Contractors and have been evaluated.
E N D
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates April 19, 2007 Prepared by:
BrentwoodUFSD Pool Phase “Ross House Pool” • Bids have been received from all Contractors and have been evaluated. • The Architect and CM have reviewed all bids and have conducted Contractor qualification meetings for all apparent low bidders. • The Architect and CM have generated a letter of recommendation to the District for each qualified low bidder associated with the project. • The Board of Education has awarded the Pool project. • Kick-off meetings to be set up.
BrentwoodUFSD Alt. G-1 New Changing Area and Storage Room
BrentwoodUFSD Alt. G-2 Spectator Seating Area Expansion
BrentwoodUFSD Alt. G-3 Diving Area
BrentwoodUFSD Alt. G-4 Replace Entire Existing Roof
BrentwoodUFSD Alt. G-5 Ceramic Wall Tile At “Project East” Wall
BrentwoodUFSD Alt. G-6 Ceramic Tile At “Project North” Wall
BrentwoodUFSD Alt. G-8 New Ceiling and Floor at Vestibules