DESCRIPTION

Final Year Project 2. Systems and Networking Department. Overall Assessment. Project Planning (4 marks). Must be submitted at the beginning of the semester AFTER discussion with supervisor. Must include the following information: Changes / modifications from project 1 (if any).

1 / 11

Télécharger la présentation

Final Year Project 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Final Year Project 2 Systems and Networking Department

  2. Overall Assessment

  3. Project Planning (4 marks) • Must be submitted at the beginning of the semester AFTER discussion with supervisor. • Must include the following information: • Changes / modifications from project 1 (if any). • Project 2 milestones. • Milestones to be completed for mid-semester demo.

  4. To be done between student and project supervisor. Supervisor must ensure that the project is developed by the student (no plagiarism). Plagiarized work should get 0 for the demo. Mid-semester Demo (20 marks)

  5. Final Demo (35 marks) • To be done between student and project supervisor. • Supervisor must ensure that the project is developed by the student (no plagiarism). • Plagiarized work should get 0 for the demo.

  6. Report (20 marks)

  7. Presentation for Excellence • Will only be done for students who are qualified to get A+, A or A-. • Student is required to present and demo his/her project in front of both the supervisor and examiner in order to get their approval to be nominated for the A presentation session • Presentation will be performed in front of a panel selected by the department.

  8. Presentation for Excellence • The panel will decide whether the project: • QUALIFIED to be given A+, A or A-, OR • NOT qualified for A+, A or A- • Only marks from supervisor will be used to determine the project grade. • The panel will also scrutinize the originality of the work • If the panel found out that the work is plagiarize or not done by the student, the student can be FAILED

  9. What to present? • Project background • Project objectives • Project scope • Overall design • Demo the project outcome

  10. Submission • You have to submit all the items below in a CD to the coordinator: • Report • Manual on how to execute/install your project • All your codes / programs • Only A and A+ student need to submit one copy or hardcover report to the college

  11. Deadlines