An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Systems EngineeringManagement MSE607BChapter 6 Part I of IISystem Engineering Program Planning

  2. Learning Objectives • Introduce system engineering program planning • First step in system management • Material presented in this module leads into the discussion of: • The organization for system engineering in module 7 • System engineering program evaluation in module 8

  3. System Engineering Process • An iterative problem solving process based on the fundamental cycle of analyse-synthesise-evaluate • Provides a comprehensive process for transforming a simple statement of user need into a complex fielded system • Provides the information by which the process can be managed and improved

  4. Management of System Engineering • System engineering is applicable in all phases of life cycle • Greatest benefits are derived from emphasis in early stages

  5. Management of System Engineering • Objective is to influence the design in the early phases of acquisition, effectively and efficiently • Leads to the identification of the individual design disciplinary needs proceeding from system level to subsystem levels • Goal is to ensure that requirements are properly balanced and integrated • Applicable engineering disciplines responsible for the design of the individual system elements to be properly integrated • System engineering first establishes the requirements then ensure proper integration throughout the life cycle • System engineering is applicable in all phases of life cycle • Greatest benefits are derived from emphasis in early stages

  6. Integration of Disciplines

  7. Management and Technology Applied to the System Engineering Process

  8. System Engineering Program Requirements • First step in the planning process • Involves definition of program, or project, requirements • Every program is different • It is essential that system engineering requirements be tailored accordingly • Concepts and methods described throughout this module are applicable to all programs • Only the nature and depth of application may vary

  9. System Engineering Planning

  10. The Need for Early System Planning • System engineering is continuous • Commencing with the definition of a need and extending • Through the development of the System Engineering Management Plan (SEMP) • As system-level requirements are defined, the planning process leads to the identification of activities to be accomplished to fulfill those requirements • Design and management decisions at this stage in the system life cycle have great impact on program activities later on • Need a complete and well-integrated planning effort • Implemented from the beginning

  11. Determination of Program Requirements • Program Requirements • Refer to the management approach and steps to be followed in the procurement and/or acquisition of the system in response to a stated need • Identification of the resources required • Program structure should be established that will enable cost effective: • Design and development • Production and/or construction • Delivery of the system to the consumer

  12. Determination of Program Requirements (cont.) • Includes identification of : • Program functions and detailed tasks • Development of an organizational structure • Development of a work breakdown structure (WBS) • Preparation of program schedules and cost projections • Implementation of program evaluation and control capability • Program plan provides the necessary day-to-day management guidance

  13. System Engineering Management Plan (SEMP) • Developed based on the Program Management Plan (PMP) • Covers all management functions associated with system engineering activities • Constitutes chief engineer’s plan for identifying and integrating all engineering activities. • Preparation is the responsibility of the “system manager” • May be accomplished by the customer or by a major contractor

  14. System Engineering Management Plan (SEMP) (cont.) • Must be developed directly from the top-level Program Management Plan (PMP). • Responsibility must be clearly defined and supported by the program manager. • Must be the key top-level design engineering plan • Content tailored to the system requirements, program size and complexity, and nature of the procurement and acquisition process

  15. Statement of Work (SOW) • A narrative description of the work required for a given project • General guidelines: • Short and to the point • Written in a clear and precise manner • Avoid ambiguity and the possibility of misinterpretation • Describe requirements in sufficient detail • Consider practical application and possible legal interpretations • Avoid unnecessary repetition and incorporation of extraneous material and requirements • Can result in unnecessary costs • Do not repeat detailed specifications and requirements already covered in referenced documentation

  16. Definition of System Engineering Functions • Cover a broad spectrum of activity • Fulfillment of objectives require involvement in almost every facet of program activity • Overall basic goals for system engineering: • Requirements developed through iterative requirements analysis • System design alternatives properly evaluated against meaningful, quantifiable criteria

  17. Definition of System Engineering Functions (cont.) • Overall basic goals for system engineering: • All applicable design disciplines and specialty areas appropriately integrated into the total engineering effort • Overall system development effort progresses in a logical manner • Established configuration baselines, formal design review, proper documentation supporting design decisions, and necessary provisions for corrective action • Various system elements/components are compatible with each other • Combined to provide an entity that will perform its required functions

  18. System Engineering Tasks

  19. Definition of System Engineering Tasks • Critical tasks • Perform a needs analysis and conduct feasibility studies • Define system operational requirements, maintenance concept, and TPMs • Prepare the system Type “A” specification • Prepare Test and Evaluation Master Plan • Prepare the System Engineering Management Plan • Accomplish functional analysis and allocation of requirements

  20. Definition of System Engineering Tasks (cont.) • Critical tasks • Accomplish system synthesis, analysis, and design integration functions on a continuing basis throughout the overall design and development process • Plan, coordinate, and conduct formal design reviews meetings • Monitor and review system test and evaluation activities • Plan, coordinate, implement, and control design changes • Initiate and maintain production and supplier liaison, and customer service activities

  21. System Engineering Organization and Interfaces

  22. System Engineering Interfaces • Interface • A statement of the functional requirements and constraints that exist at a common boundary between • Two functions (functional interface) • Two configuration items (physical interface) • Interface definition and management is essential • Breaking down the system into subsystems, modules and components to reduce complexity may result in interface complexity • There must be a balance between the complexity of any element and the complexity of any associated interface

  23. System Engineering Organization • Must lead and ensure tasks are completed in an effective, efficient, and timely manner using system-level technical expertise and leadership • Must work with, influence, and inspire many other groups within the project • Must have the respect and cooperation of the other required functions

  24. System Engineering Organization (cont.) • May be contained within the customer’s organization, with various responding subgroups within the contractor’s organization • In a contractor’s organization basic structure may constitute: • A functional approach • A project/product line approach • A matrix approach, or • Various combinations thereof. • Advantages and disadvantages associated with each of these approaches • Essential to recognize if the organization is to work effectively • Need to consider external interactions involving subcontractors and suppliers,

  25. 01-00-00 System XYZ Level 1 01-04-00 Activity d 01-02-00 Activity B 01-01-00 Activity A 01-03-00 Activity C Level 2 01-02-04 Function 4 01-02-01 Function 1 01-02-02 Function 2 01-02-03 Function 3 Level 3 Contract Work Breakdown Structure (CWBS) Preliminary System Design Phase Contract Work Breakdown Structure (CWBS) Detail Design and Development Phase Partial Work Breakdown Structure Development

  26. Development of a Work Breakdown Structure (WBS) • Large projects organized and comprehended by breaking them into smaller pieces • A collection of defined "work packages" that may include a number of tasks • A $1,000,000,000 project is simply a lot of $50,000 projects joined together • Used to provide the framework for organizing and managing the work

  27. Development of a Work Breakdown Structure (WBS) (cont.) • Our brains can normally comprehend around 7-9 items simultaneously • WBS helps break thousands of tasks into chunks that • Preparing and understanding a WBS is a big step towards managing and mastering its complexity • Used at project start for: • Defining scope • Organizing schedules • Estimating costs • Lives throughout the project in project schedule and used for reporting costs • May be used to identify/track work packages, organize data for reporting, etc.

  28. Level 1 Level 2 Level 3 3A1100 Project Management 3A1200 System Engineering 3A1300 Configuration Management 3A1400 Contract Management 3A1500 Data Management 3A1600 Integrated Logistics Support 3A1700 Supplier Management 2A1000 System/Program Management 3B1100 Basic Research 3B1200 Applied Research 3B1300 Technology Development 2B1000 Research and Development 3C1100 Airframe 3C1200 Propulsion 3C1300 Communications 3C1400 Navigation/Guidance 3C1500 Fire Control 3C1600 Countermeasures 3C1700 Reconnaissance Equipment 3C1800 Flight Controls 3C1900 Auxiliary Electronics 3C2000 Armament/Weapons Equipment 3C2100 Hydraulic Equipment System XYZ 2C1000 Prime Mission Equipment 3D1100 Peculiar Support Equipment - Organizational Level 3D1200 Peculiar Support Equipment - Intermediate Level 3D1300 Peculiar Support Equipment - Depot Level 3D1400 Common Support Equipment - Organizational Level 3D1500 Common Support Equipment - Intermediate Level 3D1600 Common Support Equipment - Depot Level 2D1000 Support Equipment Sample WBS

  29. Specification/Documentation Tree

  30. Specification/Documentation Tree (cont.)

  31. Specification/Documentation Tree (cont.)

  32. Specification/Documentation Tree (cont.) • Provides a hierarchical description of the various specifications for a systems development as part of a systems engineering process • Developed from the top down, commencing with the preparation of the system specification • Subsequently, additional specifications are applied • Top down development of design requirements is critical • Meet the system engineering objectives

  33. Specification/Documentation Tree (cont.) • Extreme care must be exercised in the initial identification and application of specifications and standards • Costly results if proper level of attention is not directed from the beginning • Critical task is tailoring specifications to particular system application

  34. Technical Performance Measurement (TPM) • Key indicator of progress, parameter or a metric that can be used to monitor the progress or performance of selected requirements • Monitored to ensure that it remains within tolerances as an indication of the progress of the design • One of the most commonly used systems engineering tools. • Identified at a very early stage in the systems engineering process • During Conceptual Design • Progress is continually monitored throughout the Acquisition Phase as a major risk-mitigation measure

  35. Development of Program Schedules • Individual program tasks are presented in terms of a time line • A beginning time and an ending time • Developed to reflect work requirements throughout all phases of a program • Commences with identification of major program milestones at the top level • Proceeds downward through lower levels of detail

  36. Development of Program Schedules (cont.) • A system engineering master schedule (SEMS) is prepared: • Laying out major program activities on basis of elapsed time • Serves as a reference for a family of subordinate schedules • Progress against a given schedule is measured at the bottom level • Task status information is related to appropriate cost account • Techniques: • Bar chart • Milestone chart • Combined milestone/bar chart

  37. Program Schedule – Sample Bar Chart

  38. Program Schedule – Sample Milestone Chart

  39. Summary • Topics • System engineering program requirements • System engineering management plan (SEMP) • Determination of “outsourcing” requirements • Integration of design specialty plans • Interfaces with other program activities • Management methods/tools • Risk management plan • Global applications/relationships

  40. Homework Assignment • Chapter 6 Part I – Textbook page 334 • Answer questions 1, 3, 9. • Continue to read Chapter 6 - Engineering Program Planning • Pages 292-334

  41. Questions? Comments?