shelley
Uploaded by
44 SLIDES
587 VUES
450LIKES

Exploring Entropic Graphs for Dimension Reduction and Pattern Matching in Manifold Learning

DESCRIPTION

This research focuses on the application of entropic graphs in dimension reduction and pattern matching, particularly for high-dimensional data such as facial images. We investigate manifold learning techniques, simulation studies, and methods for improving classification and detection performance. This includes techniques like Isomap and k-nearest neighbors to reconstruct lower-dimensional structures. Our findings emphasize the significance of estimating intrinsic dimensions and utilizing bootstrap resampling to enhance estimates, ultimately aiding in better detection and classification outcomes in various datasets.

1 / 44

Télécharger la présentation

Exploring Entropic Graphs for Dimension Reduction and Pattern Matching in Manifold Learning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Entropic graphs: Applications Alfred O. Hero Dept. EECS, Dept BME, Dept. Statistics University of Michigan - Ann Arbor hero@eecs.umich.edu http://www.eecs.umich.edu/~hero • Dimension reduction and pattern matching • Entropic graphs for manifold learning • Simulation studies • Applications to face and digit databases

  2. 1.Dimension Reduction and Pattern Matching • 128x128 images of faces • Different poses, illuminations, facial expressions • The set of all face images evolve on a lower dimensional imbedded manifold in R^(16384)

  3. Face Manifold

  4. Classification on Face Manifold

  5. Manifold Learning:What is it good for? • Interpreting high dimensional data • Discovery and exploitation of lower dimensional structure • Deducing non-linear dependencies between populations • Improving detection and classification performance • Improving image compression performance

  6. Background on Manifold Learning • Manifold intrinsic dimension estimation • Local KLE, Fukunaga, Olsen (1971) • Nearest neighbor algorithm, Pettis, Bailey, Jain, Dubes (1971) • Fractal measures, Camastra and Vinciarelli (2002) • Packing numbers, Kegl (2002) • Manifold Reconstruction • Isomap-MDS, Tenenbaum, de Silva, Langford (2000) • Locally Linear Embeddings (LLE), Roweiss, Saul (2000) • Laplacian eigenmaps (LE), Belkin, Niyogi (2002) • Hessian eigenmaps (HE), Grimes, Donoho (2003) • Characterization of sampling distributions on manifolds • Statistics of directional data, Watson (1956), Mardia (1972) • Data compression on 3D surfaces, Kolarov, Lynch (1997) • Statistics of shape, Kendall (1984), Kent, Mardia (2001)

  7. Sampling on a Domain Manifold 2dim manifold Embedding Sampling distribution Domain Sampling A statistical sample Observed sample

  8. Learning 3D Manifolds Ref: Tenenbaum&etal (2000) Ref: Roweiss&etal (2000) Swiss Roll N=400 S-Curve N=800 • Sampling density fy = Uniform on manifold

  9. Sampled S-curve Geodesic from A to B is shortest path A B Euclidean Path is poor approximation What is shortest path between points A and B along manifold?

  10. Geodesic Graph Path Approximation Dykstra’s shortest path approximates geodesic B A k-NNG skeleton k=4

  11. ISOMAP (PCA) Reconstruction • Compute k-NN skeleton on observed sample • Run Dykstra’s shortest path algorithm between all pairs of vertices of k-NN • Generate Geodesic pairwise distance matrix approximation • Perform MDS on • Reconstruct sample in manifold domain

  12. ISOMAP Convergence • When domain mapping is an isometry, domain is open and convex, and true domain dimension d is known (de Silva&etal:2001): • How to estimate d? • How to estimate attributes of sampling density?

  13. How to Estimate d? Landmark-ISOMAP residual curve For Abilene Netflow data set

  14. 2. Entropic Graphs • in D-dimensionalEuclidean space • Euclidean MST with edge power weighting gamma: • pairwise distance matrix over • edge length matrix of spanning trees over • Euclidean k-NNG with edge power weighting gamma: • When obtain Geodesic MST

  15. Example: Uniform Planar Sample

  16. Example: MST on Planar Sample

  17. Example: k-NNG on Planar Sample

  18. Convergence of Euclidean MST Beardwood, Halton, Hammersley Theorem:

  19. GMST Convergence Theorem Ref: Costa&Hero:TSP2003

  20. k-NNG Convergence Theorem

  21. Shrinkwrap Interpretation n=400 n=800 Dimension = “Shrinkage rate” as vary number of resampled points on M

  22. Joint Estimation Algorithm • Convergence theorem suggests log-linear model • Use bootstrap resampling to estimate mean graph length and apply LS to jointly estimate slope and intercept from sequence • Extract d and H from slope and intercept

  23. 3. Simulation Studies: Swiss Roll K=4 GMST kNN • n=400, f=Uniform on manifold

  24. Estimates of GMST Length Bootstrap SE bar (83% CI)

  25. loglogLinear Fit to GMST Length

  26. GMST Dimension and Entropy Estimates • From LS fit find: • Intrinsic dimension estimate • Alpha-entropy estimate ( ) • Ground truth:

  27. MST/kNN Comparisons MST MST n=800 n=400 kNN kNN n=800 n=400

  28. Entropic Graphs on S2 Sphere in 3D • n=500, f=Uniform on manifold GMST kNN

  29. k-NNG on Sphere S4 in 5D • k=7 for all algorithms • kNN resampled 5 times • Length regressed on 10 or 20 samples at end of mean length sequence • 30 experiments performed • ISOMAP always estimates d=5 Histogram of resampled d-estimates of k-NNG N=1000 points uniformly distributed on S4 (sphere) in 5D n Table of relative frequencies of correct d estimate

  30. kNN/GMST Comparisons Table of relative frequencies of correct d estimate True Entropy Estimated entropy (n = 600)

  31. kNN/GMST Comparisons for Uniform Hyperplane GMST 4-NN

  32. Improve Performance by Bootstrap Resampling • Main idea: Averaging of weak learners • Using fewer (N) samples per MST estimate, generate large number (M) of weak estimates of d and H • Reduce bias by averaging these estimates (M>>1,N=1) • Better than optimizing estimate of MST length (M=1,N>>1) Illustration of bootstrap resampling method: A,B: N=1 vs C: M=1

  33. kNN/GMST Comparisons for Uniform Hyperplane Table of relative frequencies of correct d estimate using the GMST, with (N = 1) and without (M = 1) bias correction.

  34. 4. Application: ISOMAP Face Database d=4 H=21.8 bits d=3 H=21.1 bits Mean GMST Length Function Resampling Histogram of d hat Mean kNNG (k=7) length • http://isomap.stanford.edu/datasets.html • Synthesized 3D face surface • Computer generated images representing 700 different angles and illuminations • Subsampled to 64 x 64 resolution (D=4096) • Disagreement over intrinsic dimensionality • d=3 (Tenenbaum) vs d=4 (Kegl)

  35. Application: Yale Face Database • Description of Yale face database 2 • Photographic folios of many people’s faces • Each face folio contains images at 585 different illumination/pose conditions • Subsampled to 64 by 64 pixels (4096 extrinsic dimensions) • Objective: determine intrinsic dimension and entropy of a typical face folio

  36. Samples from Face database B

  37. GMST for 3 Face Folios

  38. Dimension Estimator Histograms for Face database B Real valued intrinsic dimension estimates using 3-NN graph for face 1. Real valued intrinsic dimension estimates using 3-NN graph for face 2.

  39. Remarks on Yale Facebase B • GMST LS estimation parameters • Local Geodesic approximation used to generate pairwise distance matrix • Estimates based on 25 resamplings over 18 largest folio sizes • To represent any folio we might hope to attain • factor > 600 reduction in degrees of freedom (dim) • only 1/10 bit per pixel for compression • a practical parameterization/encoder?

  40. Application: MNIST Digit Database Sample: MNIST Handwritten Digits

  41. MNIST Digit Database Histogram of intrinsic dimension estimates: GMST (left) and 5-NN (right) (M = 1, N = 10, Q = 15). Estimated intrinsic dimension

  42. MNIST Digit Database ISOMAP (k = 6) residual variance plot. The digits database contains nonlinear transformations, such as width distortions of each digit, that are not adequately modeled by ISOMAP!

  43. Conclusions • Entropic graphs give accurate global and consistent estimators of dimension and entropy • Manifold learning and model reduction • LLE, LE, HE estimate d by finding local linear representation of manifold • Entropic graph estimates d from global resampling • Initialization of ISOMAP… with entropic graph estimator • Computational considerations • GMST, kNN with pairwise distance matrix: O(E log E) • GMST with greedy neighborhood search: O(d n log n) • kNN with kdb tree partitioning: O(d n log n)

  44. References • A. O. Hero, B. Ma, O. Michel and J. D. Gorman, “Application of entropic graphs,” IEEE Signal Processing Magazine, Sept 2002. • H. Neemuchwala, A.O. Hero and P. Carson, “Entropic graphs for image registration,” to appear in European Journal of Signal Processing, 2003. • J. Costa and A. O. Hero, “Manifold learning with geodesic minimal spanning trees,” to appear in IEEE T-SP (Special Issue on Machine Learning), 2004. • A. O. Hero, J. Costa and B. Ma, "Convergence rates of minimal graphs with random vertices," submitted to IEEE T-IT, March 2001. • J. Costa, A. O. Hero and C. Vignat, "On solutions to multivariate maximum alpha-entropy Problems", in Energy Minimization Methods in Computer Vision and Pattern Recognition (EMM-CVPR), Eds. M. Figueiredo, R. Rangagaran, J. Zerubia, Springer-Verlag, 2003

More Related