1 / 10

Infrastructure Refresh

Infrastructure Refresh. Why?. Industry Standard Servers. HP Proliant Generation Transition. Regenerate G4 to G6 2009. 14 to 1. 14 to 1. Regenerate G4 to G6 2010/G7. 20 to 1. Intel Xeon 5600. 14 to 1. Regenerate G4 to G7. 23 to 1. AMD Opteron 6100. 14 to 1. Save. 95% reduction

shubha
Télécharger la présentation

Infrastructure Refresh

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Infrastructure Refresh Why? Industry Standard Servers

  2. HP Proliant Generation Transition

  3. Regenerate G4 to G6 2009 14 to 1 14 to 1

  4. Regenerate G4 to G6 2010/G7 20 to 1 Intel Xeon 5600 14 to 1

  5. Regenerate G4 to G7 23 to 1 AMD Opteron 6100 14 to 1

  6. Save 95% reduction in number of servers 95% reduction in licence costs 97% reduction in energy costs 383% reduction in support costs

  7. 27x More compute capability in the same power envelope

  8. HP BladeSystem 32% reduction in energy costs 41% reduction in hardware costs 50% reduction in space needed 80% reduction in labour/management costs Source: Alinian Analysis of savings over 5 years in a inner city public sector organisation. 48 x DL360 quad core VS. 48 x BL460C quad core with virtual connect

  9. $48,300 saving per 100 users over 3 years 6 month ROI

More Related