Chapter 4 Drilling. Routine Drilling Operations. Routine Drilling Operations. Preparing the Site Rigging Up Spudding In (Drilling the Surface Hole) Tripping Out Running Surface Casing Cementing Casing Tripping In Controlling Formation Pressure Running & Cementing Intermediate Casing

Routine Drilling Operations - slide 1
01 / 12Routine Drilling Operations
1 / 17

Télécharger la présentation

Routine Drilling Operations
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Chapter 4 Drilling Routine Drilling Operations

  2. Routine Drilling Operations • Preparing the Site • Rigging Up • Spudding In (Drilling the Surface Hole) • Tripping Out • Running Surface Casing • Cementing Casing • Tripping In • Controlling Formation Pressure • Running & Cementing Intermediate Casing • Drilling to Final Depth • Setting Production Casing

  3. Preparing the Site • Construction • Drill site must have: • Ample space • Comply with Laws • Adequate water supply • Roads • Reserve Pits – Lined with plastic sheeting • Cellar – room beneath the drilling rig for the installation of drilling equipment • Conductor Pipe/Casing. Keeps ground from caving in (Typically 20-100 ft).

  4. Rigging Up • Assembling the Drilling Rig • http://www.osha.gov/SLTC/etools/oilandgas/drilling/rigging_up.html

  5. Spudding (Drilling the Surface Hole) • Initial Drilling • Larger diameter drill bits typically 17 ½” or larger. • Drill to a predetermined depth to get past any water sources that could be contaminated.

  6. Tripping Out • Removing the Drill String from the hole. • Times the need tripping out: • Removing the drill string for testing • Running casing • Changing bits • Very important to watch the speed at which you remove the drill string. • http://www.youtube.com/watch?v=zV3iYWgJowg

  7. Running Surface Casing • Casing is heavy-duty steel pipe that is cemented into the hole • Centralizers: attach to the outside of casing, keeps casing in the center of the hole • Scratchers: Attached to the outside and help remove wall cake from the side of the hole so that the cement can form a better bond. • Casing/Guide Shoe: Rounded heavy short section of casing that attaches to the bottom to help keep casing from snagging on the hole while being lowered. • Float Collar: Coupling that is used one to two joints above the bottom, contains a one way valve to prevent fluids from coming back up the casing.

  8. Cementing Casing • Cementing crew comes in and runs job. • Connects cementing Head and pumps the cement downhole

  9. Tripping In • Put drill pipe back in the hole • Resume drilling by running a smaller drill bit and Bottom Hole Assembly • Displaces drilling mud as the drill string is lowered into the hole • http://www.youtube.com/watch?v=6mFxaELw99I

  10. Running and Cementing Intermediate Casing

  11. Controlling Formation Pressure (Well Control) • Blow Out: the uncontrolled gushing of fluids oil, gas, water or all three from a formation that the hole has penetrated. • Kick: when formation fluid enters the well bore • Control: Is maintained through the weight of the drilling mud (Density) It is used to create a hydrostatic pressure that counter acts the formation pressure • Hydrostatic Pressure: the pressure exerted by a column of fluid in a well bore. • Formation Pressure: the pressure exerted by the formation fluids

  12. Homework Questions • What are the 3 key elements of a drill site? • What is a cellar? • What is the function of the conductor pipe? • Define “Rigging Up” • Explain the steps in drilling the surface hole. • What the 3 circumstances when you may be required to trip out the drilling tools? • What are the 4 key components that are attached to casing prior to cementing? • What are the 3 different type of casing? Which one is the longest? • What is a “blow-out? What is used to during drilling operations to control the potential of prevent blow-outs?