70 likes | 166 Vues
Upgrade project to improve particle detection system for precise mass determination of beam particles, with increased beam luminosity and advanced time-of-flight measurement capabilities. Accelerating project timeline for optimal system performance by mid-May.
E N D
ToF Readout Upgrade Jamal Rorie 1/31/06 Physics 476
Background • Particles exit the beam chamber with known momentum • ToF allows us to determine the mass of the particle • Luminosity of beam has increased 2-fold
Fast PMT (input) Rise Time ~ 4ns Fall Time ~ 8ns Pulse Magnitude <~4 V Trigger Rate up to 1kHz Board Requirements Charge Measurement 1GSPS or greater Negligible dead time (ping pong) 16 channel in Time Measurement Low and high threshold 16 channel in 25 ps resolution COPPER out Specs
Parts • HPTDC • Lab 3 • Spartan 3
Goals • Board by 3/3/06 • Firmware by 4/7/06 • Testing done by mid-May