1 / 24

Mine Warfare C4ISR

Mine Warfare C4ISR. 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment Background Purpose Products POA&Ms, short and long term Related Efforts. IT-21 install for MCM includes: ADNS (Automated Digital Network System)

Télécharger la présentation

Mine Warfare C4ISR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mine WarfareC4ISR 25 July ‘01

  2. Outline • “TRANSFORMATION” • M/MHC C4I Modernization • Architecture for C4ISR in a Mine Environment • Background • Purpose • Products • POA&Ms, short and long term • Related Efforts

  3. IT-21 install for MCM includes: ADNS (Automated Digital Network System) CFCP (COTS Fleet Communications Package) GCCS-M (NT) INMARSAT B HSD MCM Schedule: 8 MCMs by ‘01 (2 Japan, 2 Bahrain, 4 CONUS) 4 MCMs in ‘02 per D-30 process 2 MCMs in ‘03 per D-30 process C4I Ship Modernization (IT-21) and D-30 Process

  4. C4I Modernization (IT-21) and D-30 Process • IT-21 install for MHC includes: • ADNS “F” Variant (smaller, less expensive) • CFCP • GCCS-M (NT) • INMARSAT B HSD • MHC Schedule: • 10 of 12 MHCs get INMARSAT B HSD in ‘01 • Other components begin in ‘02 subject to CLF prioritization/funding • CMWC position supports D-30 process

  5. Architecture for C4ISR in a Mine Environment

  6. Architecture Background • Numerous MIW C4I-related Initiatives and Programs: • D-30 Process and C4I Modernization (IT-21) • MCM/MHC LAN IPT • MIW Network Centric IPT • ICWS/GCCS-M Integration • GCCS-M/MEDAL Interface Issues • Organic MIW System C4I Integration • Others

  7. Architecture Background • MIW C4ISR Master Plan, SEP 97 • Information needs updating • ICWS • IT-21 installs for MCM/MHC • Siprnet • MEDAL • MCM/MHC LAN • Does not adequately address organic systems • “Top 10” requirements list out of date • SPAWAR no longer uses “Master Plan” format

  8. Architecture Background • Architecture for C4ISR in a Mine Environment • DoD Architecture Framework Version 2.0, DEC ‘97 • Establishes requirements for DoD C4ISR architectures • DASN RDA CHENG using as master reference for C4ISR • CSS tasked to complete MIW C4ISR Architecture IAW Framework document in FY01 • Includes “Essential” products required for an Architecture • “Supporting” products will follow as necessary • MIW Network Centric IPT • PMS 490 and N752 Co-Chair • Evolved into “Architecture working group”

  9. Architecture Background • MIW Architecture Working Group • Core Group: • Requirements: N752, N62, CMWC, NAVOCEANO • Systems: PEO MUW (490/210), PEO A, SPAWAR 051 • Fleet: UMCM, SMCM, AMCM IPT reps, OMCM IPT rep • Other Participants: • DASN MUW • PEO MUW - EOD, 403, 411 • SPAWAR - 04F, 155, 157, 158, 182 • CNO - 096, N2, N76, N77 • SWDG • ONR, NAWC AD, NAVAIR, JHU/APL, ARL/UT

  10. Purpose of the Architecture • Focused, Fleet-based reference for C4ISR systems requirements • exposes shortfalls in C4ISR • drives acquisition resource priorities • driven by (common) TACTICS • Basis for C4I Support Plans, required for all Operational Rqmts Documents (ORDs) • Master reference for: • systems integration requirements • interoperability in combined/joint environment • Forcing function for integration of CVBG/ARG and supporting MCM assets

  11. Architecture “Essential” Products • “All” Views • AV-1: Overview and Summary Information • AV-2: Integrated Dictionary • “Operational” Views • OV-1: High-Level Operational Concept Graphic • OV-2: Operational Node Connectivity Description • OV-3: Information Exchange Requirements • “Systems” Views: • SV-1: Systems Interface Descriptions • “Technical” Views: • TV-1: Data/Systems Implementation Standards

  12. Architecture Context • Includes dedicated and organic MIW systems expected to be in the fleet in ‘05 - ‘07 • Addresses three operational MIW environments: • Peacetime: Battlespace Preparation • SLOC Scenario (MCM and Mining) • Amphibious Landing Scenario (MCM and Mining)

  13. Amana Side Scan Sonar Side Scan Sonar Minelike Contacts “OV-1” for Peacetime Battlespace Preparation

  14. “OV-1” for Amphibious Assault Scenario

  15. OV-3 Information Exchange Requirements Sample

  16. OV-3 Information Exchange Requirements Do we have the systems to do this?

  17. IT-21 Systems FLEET INPUT Architecture for C4ISR in a Mine Environment MCM/MHC LAN AV-1 MEDAL AV-2 OV-1 ICWS/ GCCS-M Interface OV-2 Info Exchange Requirements OV-3 Organic MIW C4I Interface SV-1 TV-1 Others...

  18. C4ISR Short Term POA & M ‘01 • FEB: Distribute MIW C4ISR Master Plan & Draft Architecture Document • MAR: Next NCW IPT meeting • 2-day “chop” session on Draft Architecture • Determine & Formalize SPAWAR role in MIW C4ISR • MAR: Send Draft to Fleet (MCMRONs, Organic Team) • APR: Interim IPT meeting • MAY: Next NCW IPT meeting • Final “DC” Chop on Architecture • Long Term POA&M • JUN: Send Draft to Fleet (MCMRONs, Organic Team) • JUL/AUG: Architecture Briefs to the Fleet • SEP: Prepare Fleet-generated POM 04 C4ISR Issue Papers

  19. Architecture Briefs to Fleet • Initial brief to senior fleet • Background: Requirement for Architecture • Our (top down) process and the shortfalls exposed in Version 1 • Our connection to Fleet Engagement Strategy and Mainsteaming Mine Warfare • Long Term Plan for Architecture • Connect top down to bottom up in IERs • C4I Support Plan • POM-04 Issue paper reviews • Take aways: • Reconciled POM-04 Issues • MIWC “Turnover Package” elements • Fleet Architecture POC’s

  20. MIWC “Turnover Package” • Elements that make up the MIWC’s continuous SA • Battlespace preparation • Priorities/Tasking for Environmental Data Collection • Q-routes and CVOAs • Threat (Mines and Tactics) • Offensive MCM plan (C5F Countermining CONOPs ‘98) • Targeting priorities • I & W • ROE • Status of MCM assets (dedicated & organic) • IDTC inputs • MIW-related training requirements • Pre-deployment mine scenarios (JTFEX, BG/ARG IT)

  21. Next Step when Architecture is “Done” • MIW C4I Support Plan • C4ISP already a CJCS requirement for individual systems • SPAWAR (051) C4ISP experts available to draft & maintain • Can tailor C4ISP to include useful parts of ‘97 • Master Plan • Prioritized C4ISR shortfalls • Tables and figures • Establish MIDIS

  22. MIW Information Exchange Requirements Definition Information System (MIDIS) • Access Database that stores C4ISR info as a “dynamic” representation of OV-3 • Single location for information about activities, information exchange mechanisms and shortfalls • Long term: Repository for actual data collected during ops/exercises in order to establish OV-3 that continuously reflects reality

  23. C4ISR Long Term POA & M OCT ‘01: POM-04 C4ISR inputs ‘02: MIW C4I Support Plan Begin adding ASW Considerations ‘03 - ’07: Update Architecture and C4ISP regularly (periodicity TBD) to: - Stay ahead of OMCM systems introduction - Incorporate technology upgrades - Identify shortfalls

  24. Related Efforts • CVBG/ARG MIW CONOPS, CLF/CPF • End-to-End OMCM Assessment, PEO MUW • Mine Warfare Fleet Engagement Strategy, N752 • Mainstreaming Mine Warfare, N752 • Common Undersea Picture (CUP), • ASTO/N74/PEO MUW • Horizontal Integration, SPAWAR 051 • Naval Integrated Information Network IPT, • SPAWAR 051/NAVSEA 05J

More Related