What steps shut down the gantry cranes

The overhead crane comes in several designs with one of the major options including the gantry crane. Here we are able to report on the use and function of the gantry hoist, gantry cranes, and gantry crane plans. Atlas Rigging & Transfer is associated with Hoisting, Rigging and Machine Moving Services since 30 years. It is a one-stop shop for Heavy Machinery Services, Plant Commissioning, Electrical Installation & Fabrication Services as well. You can find more about it at, Website: http://www.atlasrigging.net/ Gantry Crane Services: http://www.atlasrigging.net/atlas-services/oversized-overweight/cranes/ Google Plus: https://plus.google.com/117815962540287465418/about

steven121
Télécharger la présentation

What steps shut down the gantry cranes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How to carry out overhead Gantry crane procedures while performing any activity? Atlas Rigging & Transfer Google Plus https://plus.google.com/117815962540287465418/about

  2. Safe utilization of the gantry crane plans Workers’ area safety For safety reasons, the workers are not permitted to work beneath an overhead load or ride on the load/hook. Any directions given to crane operators should be clear and no sudden alterations in direction must be advised. The lifting area of the load should always be kept clear. Safety of the brakes A test of the brakes on the gantry cranes is critical to guarantee the control has full movement in place. It can be done by turning off the button after making a slight lift off the floor. If the weight isn’t held make sure to replace the weight on the ground and wait until fully repaired until used again. Prior to relocating the trolley, make certain lift weight to a height that will clear obstacles.

  3. Looking at the gantry hoist plans • The operating buttons or switches are all marked correctly. Make sure all the buttons works correctly. When carrying out the check release the button as soon as it is pressed. • The function of the corner-stop has the capacity to halt the trolley motionless off the beam. • Seek out missing or ruined parts. • The power change for the crane is obvious to see and operate. • The function of the low-limit switch to help switch on the lower hoist load. Give a minimum of 5 full cord turns for the elevating drum. • Check the limit switch to make certain it is able to trip the plug.

  4. Procedure of Shutting down the Gantry Cranes

  5. Atlas Rigging & Transfer is associated with Rigging, Hoisting and Machine Moving Services since 30 years. It also has expertise in Consulting Services, Metal/ Steel Fabrication, Machine & Electrical Installation Services. You can Contact Atlas Rigging & Transfer through, • Website: http://www.atlasrigging.net/ • Gantry Hoist Plan Services:http://www.atlasrigging.net/atlas-services/oversized-overweight/cranes/ • Follow on Google Plus: https://plus.google.com/117815962540287465418/about