820 likes | 828 Vues
Step 1 Operational requirement results. Regulation and load following requirements determined 2010 CPUC-LTPP scenarios New load, wind and solar profiles were developedUpdated load, wind and solar forecast errors were used to calculated requirements Refer to appendix for changes to profile and for
E N D