An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Monday • 14:00 beam dump • End fill 2797 after 7h 2m of stable beams 480 bunches, ATLAS toroid OFF. • Access: • ATLAS • change of the PC of RCVBV24.L4B1, • repair of QPS/EE on RCS.A23B1 • intervention on the crates of the BPMD in P6. • ATLAS toroid ramped up • The collimator vistar display was fixed and the DIP processes are being restarted (timestamp problem). • The sequence for setting the XRP thresholds for TOTEM was fixed by Stefano. • The vacuum solenoids around the injection kickers have been switched back ON; they had been left OFF after the technical stop. • unmasked all three masks in RF monitoring in Big Sister. They were all dating back from 2011. LHC status

  2. Monday afternoon • 17:30 Injecting • 19:24 Stable beams • Fill 2798 - 852 bunches • 20:01 Beams dumped – big UFO MKI2 LHC status

  3. Monday evening • Access prepared for LHCb. • 22:00 Access finished ready for injection • Beam quality problems from the SPS. • The vertical emittanceswere measured to be 2 um (instead of 1.5). • 00:53 lose 2799 in the squeeze • trip of RQ7.L7B1 – QPS trigger • 02:00 Back around at injection • 03:38 Fill 2800 - beam dumped by high losses on Q4.L6 on RS 5.2s after 1 minute into the collisions BP. • Tune signal for beam 1 show instabilities in H LHC status

  4. Familiar picutres LHC status

  5. Tuesday morning • 05:30 Access start for Atlas • Compressor – Torroid • 07:10 Atlas finished • 08:10 – lose test ramp to un-masked interlocks • Try test ramp again – chromaticity and then another shot at 854 bunches • SPS working on beam quality in the meantime LHC status

  6. LHC status

  7. LHC status