1 / 26

INPO Update CMBG Meeting June 2013

INPO Update CMBG Meeting June 2013. 2013 Department Focus Areas. Engineering Fundamentals and Technical Authority Vendor Product Quality Digital Projects / Cyber Security Seismic / External Events AC Power Reliability. 2013 Ongoing Work Efforts.

tammy
Télécharger la présentation

INPO Update CMBG Meeting June 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INPO Update CMBG Meeting June 2013

  2. 2013 Department Focus Areas • Engineering Fundamentals and Technical Authority • Vendor Product Quality • Digital Projects / Cyber Security • Seismic / External Events • AC Power Reliability

  3. 2013 Ongoing Work Efforts • Principles, Objectives, and Criteria Revision • EN.1, Engineering Fundamentals • EN.2, Technical Authority • Updated CM.1, Margin Management Recognizing when your current design basis may need to be changed • Fukushima • Open Phase conditions • Seismic Events • Flooding

  4. 2013 Ongoing Work Efforts • Transitional CM for New Construction Plants • Need CM controls / programs that use technology • Revised Evaluation Guidelines and Procedures • Evaluation Guidelines Support Focus Areas

  5. Engineering Fundamentals and Technical Authority

  6. Engineering Fundamentals • Engineering personnel apply essential knowledge, skills, behaviors, and practices needed to ensure: • Equipment performs as required • The plant is maintained within design requirements • Margins are controlled • The plant is operated safely and reliably

  7. Engineering Fundamentals • Five principle level categories of engineering fundamentals • Monitor and Evaluate • Operate, Maintain, and Modify in a Controlled Manner • Communicate, Advise and Advocate • Acquire and Maintain Expert Knowledge • Critical Thinking, Decision-Making, and Challenging

  8. Must Know OE - MKOE • Part of Performance Objectives & Criteria • A collection of the most important OE documents issued since 1980. Engineering MKOE is found in INPO 12-005. • As discussed in Recommendation 2 of SOER 10-2, Engaged, Thinking Organizations • MKOE should be included in initial and continuing training for supervisors

  9. Vendor Product Quality

  10. Vendor Product Quality Ralph Schwartzbeck Terry Schuster • Working Meeting in April 2012 • Selected A/E firms and Various Utilities • Collected best practices for the different blocks in the flowchart • Issued Evaluation Guideline for Vendor Oversight / Engagement • Project Initiation & Project Performance

  11. Vendor Product Quality • INPO 90-009, Conduct of Design Engineering Revised for Cyber, Digital, and Vendor Quality Good Practices (Nov. 2012) Examples of Appendix C (new): • Identify, document, and communicate expectations between engineering vendors and the requesting organization • Perform a feasibility study to identify the best solution

  12. Vendor Product Quality • Perform licensing review prior to starting design work • Develop a road map of applicable standards, procedures, and best practices. Communicate this to the engineering service providers • Determine hardware lead time impacts on project schedules • Document and communicate expectations for project and deliverable quality

  13. Digital Projects / Cyber Security

  14. Digital Projects Ralph Schwartzbeck Bill Nowicki Gary Garrett Doug Kinsman Digital Project Guidance Modification Testing FMEA Analysis Integration of Digital Equipment

  15. Digital Projects Recent Industry Workshop – May 2013 IER L2-11-2 Scram Analysis and IERL4-12-87 Causes of Digital Upgrade-Related Events Community of Practice Webpage Pilot Review Visits

  16. Digital Projects • Communication / Technical Leadership (from IER 12-87) • Vendor Interface and Oversight • Technical risk assignment and monitoring • Project personnel knowledge and experience • Supervisor assignment and monitoring of project engineering activities

  17. Digital Projects • Community of Practice • Used to Share Issues Unique to Digital Modifications • Design Project Issues May Occur Prior to Installation • Pilot Review Visits • Two sites approved in 2013

  18. Cyber Security • Created Cyber Security Training NANTeL • Awareness (general) • CSAT (assessment team) • Technical (OPS, MA, Design Engr., Engr. Support) • Added Digital/Cyber event codes in EPIX • 2013 Plant Evaluations will include cyber security • Waterford and Beaver Valley Plant Evaluations

  19. Cyber Security • Scope of Cyber Security Program • Safety-related, Important to Safety • Security • Emergency Preparedness • Support systems (BOP) and equipment, which if compromised, would adversely impact configuration control and plant operations

  20. Seismic / External Events

  21. Seismic Update • How-To has been developed and is being used. • No real issues with sites compliance; use with IER L2-12-12 response • IER L4-13-3 issues for NAPS Lessons Learned • EPRI NP-6695 has been supplemented with TR 1025288

  22. External Events • PO & C include - External Events (CM.1) • 11 Evaluation Activities • Beyond Design Basis Event • Cliff edge effects • IER on Fukushima Lessons Learned: • Out for Review • IAEA promotes doing Periodic Safety Reviews every 10 years

  23. External Events • Post-Fukushima NRC Near Term Task Force Recommendations (2.1, 2.2, and 2.3) • Items 2.1 and 2.3 are being performed now; NRC Request for Information, issued March 12, 2012 • Summary of Industry Results (NRC Follow-ups) • Capability to Mitigate Fires in Large Areas of Plant • Licensee Capability to Mitigate Design Basis Internal and External Events

  24. AC Power Source Reliability

  25. AC Power Source Reliability Shawn Simon Ralph Kothe Steve Swanson • Joint Focus Area with Equipment Reliability • Event LOOP Matrix Reviews • Joint TSG / EDG Reviews • Evaluator Guideline (How To) Issued • Identify vulnerability to design related risk • Checklist Attachment 3, Evaluator Checklist • IER Focused on Causes / Contributors • Target June 2013

  26. EN/CM Department Staff

More Related