An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PBN Plan Development Aviation Industry Forum 18 November 2009

  2. Current State • RNAV & RNP Operations in NZ Airspace • RNAV 10 and RNP 4 in Oceanic Airspace • RNAV 1 SIDs and STARs at Auckland, Wellington and Christchurch • RNAV(GNSS) Approach / Departure procedures @ 57 locations. • APV @ 16 runway ends. • RNP AR @ Queenstown. PBN Industry Forum 18 November 2009

  3. Long Term Goals (+2018) • Safety (precise trajectory management, CDA) • Predictability • Efficiency (min air distance / optimum aircraft determined profile) • Minimise environmental impact (CO2 NOX & noise) • Maximise Capacity utilisation (aerodrome & airspace) • High aircraft utilisation (sectors per day) • Schedule reliability • Cost effective investment • Minimised quantity of CTA and optimise design 18 November 2009 PBN Industry Forum

  4. Performance Specifications for Phase 3 – Aeroplane & Helicopter • Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA. • Query Class G airspace below OCA CTA?? • Domestic Enroute – RNP 1 above F145 • Terminal CTA – Advanced RNP 1 • Approach Procedures – RNP APCH • Transition Timetable (2018+) 18 November 2009 PBN Industry Forum

  5. Performance Specifications for Long Term Goal (1) • Controlled Time of Arrival: 10 - 15 sec ETA accuracy for crossing points • Enablers • 4DT / AMAN/ DMAN/ CAM II • Continuous Surveillance (updating progress) • CPDLC Comms / Domestic Datalink? • Advanced MET Modelling • Advanced FMS capability 18 November 2009 PBN Industry Forum

  6. Performance SpecificationsLong Term (2) • Optimised air route design • Features • Enroute track centreline spacing • SIDs & STARs de-conflicted • Enablers • Airways PBN routes design work (PBN Implementation Project). • Part 173 PBN Industry Forum 18 November 2009

  7. Performance Specifications for Phase 1 – Aeroplane & Helicopter • Oceanic – Retain RNAV 10 and RNP 4 for Phase 1. • Domestic Enroute – RNAV 1/2 for all promulgated routes above F145/ 245 in domestic CTA. • Terminal Operations – RNAV 1 for all Terminal routes with Surveillance services • Approach Procedures – Mix of Conventional & RNP APCH and RNP AR APCH • No Change for Helicopter Ops • Transition Timetable (2008 - 2013) 18 November 2009 PBN Industry Forum

  8. Phase 1 – Action Items: Aeroplane & Helicopter • Evaluation of DME/DME coverage to support RNAV 1 all routes (Enroute and TMA)*. • Completing task 1 March 2010 (Airways & CAA) • GNSS IFR AC and associated Part 19 D exemption. • Completing AC task by 1 March 2010 (CAA) • Part 19 D Rule plus related Rules changes • Completed by 1 July 2011 (MOT & CAA). *Note VOR /DME updating does not support RNAV 1 specifications. What do aircraft operators need to do? 18 November 2009 PBN Industry Forum

  9. Performance Specifications for Phase 2 - Aeroplane • Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA. • Query Class G airspace below OCA CTA?? • Domestic Enroute – RNP 2 or 1 above FL145 • Domestic Enroute – RNP 2 below FL145 • Terminal CTA – Advanced RNP 1 (RF Legs) • Approach Procedures – RNP APCH • Transition away from Conventional approaches. • Transition Timetable (2013 – 2018) 18 November 2009 PBN Industry Forum

  10. Phase 2 – Action Items: Aeroplane • Determine drivers for changing performance specifications in OCA. • GNSS Nav, ADS – C Surveillance and CPDLC Comms . • GNSS Primary Navigation • assumes enabling Rules amendments are in place What do aircraft operators need to do? 18 November 2009 PBN Industry Forum

  11. Performance Specifications for Phase 2 - Helicopter • Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA. • Query: Class G airspace below OCA CTA?? • Domestic Enroute – RNP 2 (RNP 0.3 Special procedures / routes) • Terminal CTA – Advanced RNP 1 • Approach Procedures – RNP APCH • Transition away from Conventional approaches. • Point in Space arrivals and departures • Transition Timetable (2013 - 2018) 18 November 2009 PBN Industry Forum

  12. Phase 2– Action Items Helicopter • Awaiting PBN Manual amendment – due 2011 • PANS OPS Design criteria being updated – due 2010. 18 November 2009 PBN Industry Forum