1 / 4

Action Items 1 November 2006

Action Items 1 November 2006. Action Items - I. Assess frequency coverage at 22 GHz vs. science goals, and decide whether lower frequency should be changed—Murata, 1Dec06 Informal mission request to Europe about desired contributions—Hirax/Gurvits, 11Dec06

thais
Télécharger la présentation

Action Items 1 November 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Action Items1 November 2006

  2. Action Items - I • Assess frequency coverage at 22 GHz vs. science goals, and decide whether lower frequency should be changed—Murata, 1Dec06 • Informal mission request to Europe about desired contributions—Hirax/Gurvits, 11Dec06 • Form team for MoO proposal to NASA—Murphy, 1Dec06 • Letters to NASA/ESA from JAXA/ISAS—Hirax, Preston, Gurvits, 31Jan07 • Assess possibility of using 26 GHz downlink, plus “timing” uplink near 26 GHz—Murata/Kono + D’AddarioPeng, 15Dec06 • Compute tracking time availability for combinations of 3 or 4 stations, determine which ones have 75-80% coverage, and decide which ones are politically feasible—Murphy/Murata, 1Dec06

  3. Action Items - II • Generate agreed-on link budgets with common assumptions, for different tracking stations and antennas--Kono, Langston, Lopez Fernandez, 15Dec06 • To be followed by decision on 1 Gbps QPSK vs. higher order modulation to use only part of 1 GHz allocation • Estimate performance of Usuda 10m antenna at 26 GHz, 38 GHz--Kono, 22Nov06 • Check on availability of 1 Gb/s QPSK demodulator at JPL--Murphy, 1Dec06 • Propose method to pass on data from GPS, accelerometer, momentum dumps—Murata, 30Apr07

  4. Action Items - III • If WIDAR correlator takes over all normal VLBA processing, could the VLBA correlator conceivably take on Space VLBI processing at 1 Gbit/s?—Romney, 15Dec06 • Draft common tracking station/link design and specification—Murata/Kono, 31Dec06 • Updated science case—Hagiwara, 30Nov06 • ARISE Executive Summary sent from Ulvestad • Next meeting

More Related