thea
Uploaded by
13 SLIDES
277 VUES
140LIKES

Enhancing Construction Efficiency with Web-Based Applications for As-Built Data Capture

DESCRIPTION

This presentation by Johan Smet at the Geospatial World Forum 2013 discusses leveraging web-based applications to capture rich as-built data during construction. It highlights the significant improvements in project management, risk mitigation, and overall construction productivity. Key benefits include increased efficiency, material savings, reduced rework, improved safety, and decreased environmental impact. The webinar emphasizes real-time asset management, progress and quality monitoring, and decision-making enhancements, leading to better scheduling, cost visibility, and a streamlined workflow in construction projects.

1 / 13

Télécharger la présentation

Enhancing Construction Efficiency with Web-Based Applications for As-Built Data Capture

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Using Web-based Applicationsto Capture Rich As-built DataDuring ConstructionJohan SmetGeospatial World Forum 2013

  2. Managing Project Risk Quality Cost Schedule Safety Liability

  3. The Basics: Field Productivity • Guiding tools with millimeter accuracy • Highly increased efficiency • 11% materials savings • +30-70% machine productivity • 43% fuel savings • 50% rework reduction • 30% Project cost reduction z • Improved Safety • Reduced environmental impact

  4. Connecting the Site

  5. Connecting the Site

  6. Real-time Asset Management • Utilization/ allocation • Alerts • Maintenance

  7. Connecting the Site

  8. Connecting the Site

  9. Real-time Progress Monitoring • Coverage • Elevationmap and profile • Cut/fill • Volumes

  10. Real-time Production Monitoring • Cycle times • Load counts • Haul distances • Material moved • Optimize!

  11. Real-time Quality Monitoring • Pass count • CompactionValue or Temp • Lift thickness

  12. Managing Project Risk • Optimizing asset allocation • Field task efficiency • Identifying and managing outliers • Fine-tuning production workflows Cost + Visibility of the “One Truth” • Consistent and predictable processes • Faster decisions, exception management Schedule Quality • Improving accuracy for all operators • “100% sampling” Safety • Keeping people away from machines • Fewer working hours for the same output Liability • Permanent record

  13. Using Web-based Applicationsto Capture Rich As-built DataDuring ConstructionJohan SmetGeospatial World Forum 2013

More Related