1 / 8

Status Update

Status Update. Date: February 8, 2011 Group: CubeSat Deorbit Device Members: Jake Tynis Joshua Laub Lindsey Andrews. Previous work. Performed lab test to examine different folding techniques and frontal surface area when inflated

todd-moore
Télécharger la présentation

Status Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Update Date: February 8, 2011 Group: CubeSatDeorbit Device Members: Jake Tynis Joshua Laub Lindsey Andrews

  2. Previous work • Performed lab test to examine different folding techniques and frontal surface area when inflated • Downloaded STK software and became more familiar with the program’s capabilities

  3. Previous work (cont’d) Budget • Added details to budget for different designs (space-qualified and lab alternate)

  4. Previous work (cont’d) • Constructed mock-up device container • Materials: • Obtained quotes on aluminum from suppliers • Got in touch with WackerChemie AG, manufacturer of Elastosil S 36 • Approached DuPont about Suva 236fa • Contacted ASCO for quote on micro solenoid valve

  5. Current Work • Interfacing with WackerChemie to find a suitable alternative to Elastosil S 36 • Still working with DuPont (slow to respond) • Writing budget proposal • Preparing to meet with NASA to discuss exploration of different materials • Gathering information about a lab set-up using micro solenoid valve with labview

  6. Planned work • Short-Term: • Meet with NASA materials group • Finish and send out budget proposal • Continue looking into valve actuator of deorbit device • Long-Term • Order materials • Investigate electronic initiation of lid opening • Build lab-setup with actuator capability

  7. Gantt Chart

More Related