1 / 19

14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44

14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44. Geneva March 2, 2012. Patrick Fiévet Heat of IT Operations and Support Section. Agenda. IPCRECLASS Project introduction and highlights Project plan Project status and demonstration Perspectives.

Télécharger la présentation

14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44 Geneva March 2, 2012 Patrick Fiévet Heat of IT Operations and Support Section

  2. Agenda IPCRECLASS • Project introduction and highlights • Project plan • Project status and demonstration • Perspectives

  3. IPCRECLASS project Project introduction and highlights • On-line and off-line reclassification • IPC reclassification stage management • Validation (calls to IPCPUBPREP validation service) • Earliest possible feedback and alerts • Monitoring • Backward compatible protocol

  4. IPCRECLASS project Project introduction and highlights • Export WL for off-line reclassification • Preserve email based submission of RL through IPCRECLASS • Several filter options (WL, RL, reports, stages,…) • WL and RL visible under IPC reclassification web site

  5. MCD-OPS Espacenet Patentscope USPTO DPMA IPCRECLASS MAP IPCReclassificationWebsite MCD IPCRECLASS IPCPUBPREP Offices

  6. IPCRECLASS Project plan Preparation- Resource based planning: • Project initiation: Q2 2010 • Terms of reference Q3-Q4 2010 • Procurement procedure and bid selection: Q2 2011 • Outsourced Implementation: Q3-Q4 2011 • Integration, acceptance, operational setup: Q1 2012 • Production use: Q2 2012

  7. MCD-OPS Espacenet Patentscope USPTO DPMA IPCRECLASS status IPCReclassificationWebsite MCD IPCRECLASS IPCPUBPREP Offices

  8. IPCRECLASS Status Project Status: • implementation 100% completed • WIPO acceptance testing completed, • IPCRECLASS available for testing by offices, • Test period: February 21-March 31, 2012

  9. IPCRECLASS status: Practical aspects: • Visit IPCRECLASS on-line help, • Under Manage/Office, Update your email address(es), • Reclassify according to your office WL i.e.« TO DO » list • Check errors received from MCD or off-line submissions • See your office reclassification progress • IPCRECLASS URL: http://www.wipo.int/ipcreclass using your Office Rapporteur Login e.g.: BRRAP01

  10. WL Welcome Screen (BRRAP01)

  11. Online reclassification

  12. Add new symbol

  13. Return selected symbol

  14. Mark reclassification as completed

  15. Upload “Offline” RESULT LIST (BRRAP01)

  16. “Offline” RESULT LIST was uploaded

  17. REPORTS

  18. IPCRECLASS project perspectives Next steps: Towards production use • Transition plan based on residual WL • Production use : Mid-April for IPC 2012.01 • Freeze of reclassification submissions April 10-13 • Residual WL for previous IPC revisions to be prepared by EPO (2012.01 back to 2007.01), • IPC reclassification web site reset, • IPC 2013.01 reclassification 100% through IPCRECLASS

  19. IT operations and support for IPC Questions? Thank you

More Related