140 likes | 388 Vues
This document details the manufacturing process of beverage cans, focusing on the key stages: blanking and drawing, wall ironing and end forming, trimming, necking and flanging, cleaning, coating, and printing. Each stage is outlined with a clear description and illustrates the sequential steps involved. From the production of two-piece cans to the final coating and printing, this guide serves as a comprehensive resource for understanding the complexities and techniques used in beverage can manufacturing.
E N D
ManufacturingProcess 2009012135 Kang myeonghyo 2009011859 Jujun sung Beverage Can
Index • Product • Process • Blanking & Drawing • Wall ironing & End forming • Trimming • Necking & Flanging • Cleaning • Coating & Printing
1. Product • Beverage Can ( 2-piece = bottom, upper ) 3/ 11
2. Process Wall ironing & End forming Blanking & Drawing Trimming • Coating & Printing Necking & Flanging • Cleaning 4 / 11
a. Blanking & Drawing ① ② ③ ④ 5 / 11
b. Wall ironing & End forming ① ② ③ ④ 6 / 11
c. Trimming ① ② 7 / 11
d. Necking & Flanging ① ② ③ ④ 8 / 11
e. Cleaning 9 / 11
f. Coating & Printing 10 / 11
f. Coating & Printing 11 / 11