30 likes | 117 Vues
Prepared for:. Prepared by:. Federal Highway Administration. The Johns Hopkins University Applied Physics Laboratory. ITS/CVO Architecture Conformance: Interoperability Testing Strategy. POR-98-7076 P.2 June 1999. Please note that this is a Preliminary Issue.
E N D
Prepared for: Prepared by: Federal Highway Administration The Johns Hopkins University Applied Physics Laboratory ITS/CVO Architecture Conformance: Interoperability Testing Strategy POR-98-7076 P.2 June 1999
Please note that this is a Preliminary Issue It is important to note that this is a preliminary version of this document. All completed sections have been reviewed by JHU/APL, but not by other DOT contractors or state/federal government agencies. The purpose of this issue is to obtain comments and feedback from those external organizations before a baseline version is published. Please provide comments, suggestions, and additional information/requirements to be included in this document to Ms. Karen Smith at: • E-mail: Karen.Smith@jhuapl.edu • Phone: 240-228-8747 • Fax: 240-228-6149 • The Johns Hopkins University • Applied Physics Laboratory • 11100 Johns Hopkins Road • Laurel, MD 20723-6099 • You can use the Document Comment and Evaluation Form at the end of this document to assist in your evaluation if you prefer.