In Milestone 2 of your Foundation Degree IT project, focus on producing a robust design specification that acts as a blueprint for your system implementation. This document will reflect your project's unique requirements and include both functional and non-functional aspects. Utilize various design techniques, such as algorithms, flow charts, and interface designs, tailored to your project's needs. Additionally, develop a realistic project plan using tools like Microsoft Project or Excel, updating it as the project progresses. Maintain a project logbook to document communications and issues throughout the project lifecycle.

1 / 8

Télécharger la présentation

Project Milestone 2: Design Specification and Planning Techniques for IT Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Foundation Degree IT Project Milestone 2: Design and Project Planning

  2. Design specification • Map the logical models and produce a design specification • The design specification will be different for everyone but should reflect your project and the project area • Refer to your functional and non-functional requirements • This is basically the blueprint for implementing your system/solution and how to do it • Design techniques are used as part of this process Richard Hancock

  3. Design techniques • Look at your methodology to see what advice it gives you about design techniques • Dependent upon the project • Could be: • Algorithms • State transition diagrams • Data dictionaries • Query design • Storyboards • Interface designs • Hierarchical sitemaps • Network diagrams • Floor plans/layout • Flow charts Richard Hancock

  4. Project planning • Production of some sort of project plan • Can be done using: • Microsoft Project • Open Workbench • Excel spreadsheet • Be realistic with your time planning! • You will need to revise your original project plan (baseline) as the project develops therefore you should end up with several plans over the course of the project • You will refer to your time plans in the evaluation (Milestone 3) in order to reflect upon your time management skills Richard Hancock

  5. Project log book • Use the project log book to summarise your email communication/progress/issues etc and include in the report for the submission *** Richard Hancock

  6. Summary • Design specification • The blueprints from which a solution/system can be consistently developed • Project design techniques will vary considerably • The techniques are dependent upon what your project is about • If you gave your design to someone else, could they implement it? • Project planning • Make use of Gantt charts • Keep them up to date with changes to your plans • You should end up with a series of them as the project matures over time Richard Hancock