NA62 straw tracker readout status
NA62 straw tracker readout status. Georgios Konstantinou. NA62 straw tracker data flow. Front end boards. Straw readout board. TEL62. Front end to SRB. Successful testing for 2.5 m cable, 800 Mbps of data readout Finalizing commands and increasing reliability of the link (firmware).
NA62 straw tracker readout status
E N D
Presentation Transcript
NA62 straw tracker readout status GeorgiosKonstantinou
NA62 straw tracker data flow Front end boards Straw readout board TEL62
Front end to SRB • Successful testing for 2.5 m cable, 800 Mbps of data readout • Finalizing commands and increasing reliability of the link (firmware) Front end boards Straw readout board
SRB to TEL62 • Link: Testing with different cable lengths and properties: -Twisted pair Ethernet cable vs optical link (cost, radiation hardness) -Electronic noise (office/lab, building renovation) -Different grounds -Mezzanine card TEL62 Straw readout board
SRB to TEL62 • Cable testing: • Setting: Use of National Semiconductors DS92LV3241/DS92LV3242 ~ 2.5 GbpsSERialiser-DESerialiser with DE0-nano Cyclone IV FPGA test boards. • Different lengths of STP-UTP cables. • Different pre-emphasis choices.
SRB to TEL62 • Why unshielded? - possibility of radiation hard materials - CERN store • Disruption Factors • Drilling! • Cable spatial distribution • Heavy electronics on operation within 1m from the cable • Compared to better results before drilling and in the office (Andrea Villar’s measurements)
Mezzanine Card • 12 links (extensive (~30) Gbps possibility), unified on board FPGA SERDES chips, standard (or controlled) on board pre-emphasis and cable equalisation circuitry. • Design starting soon (after SRB link firmware is finalized)
The End Thank you, Questions?