1 / 15

Wholesale Market Subcommittee

Wholesale Market Subcommittee. Report to Technical Advisory Committee. TAC Action Items. TAC Voting Items CRR Credit Parameters

ullery
Télécharger la présentation

Wholesale Market Subcommittee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wholesale Market Subcommittee Report to Technical Advisory Committee October 2010

  2. TAC Action Items • TAC Voting Items • CRR Credit Parameters • At the September 22, 2010 Regular WMS meeting, members heard two presentations from Luminant and LCRA regarding “right-sizing” Credit Parameters to ensure adequate CRR credit requirement such that auction awards don’t result in collateral calls from FCE calculations • Credit Parameters must be in place by November 1 for November Auction.

  3. Discussion Summary

  4. TAC Action Items • TAC Voting Items • CRR Credit Parameters

  5. TAC Action Items • TAC Voting Items • CRR Credit Parameters • WMS voted to support the Luminant proposal for M=0, A=0. • Motion carried 70.4% for and 29.6% against with 2 abstentions • One Consumer and one Coop Abstained. • Recommend TAC Approval and request that the Board make the Parameters effective for the November 2010 (Section 7.5.5.3 is effective November 1, 2010 and the Auction is November 12, 2010)

  6. TAC Action Items • TAC Voting Items • SMOGRR009, Submittal Timeline for EPS Metering Design Proposals • WMS voted to recommend approval of SMOGRR009 as recommended by the MWG in the 9/21/10 MWG Report. • One Independent Generator Abstained • Recommend TAC Approval

  7. TAC Action Items • TAC Voting Items • Market Reform and IMM Nodal Issues –WMS Assignments related to CRR Derate • At the August Board Meeting, the IMM was asked to review the risk assessment that was prepared by Market Reform (“MR”) • Category 2: Likely to Need Fixing Soon (after market start) • Load Zone Modeling/Pricing • Ancillary Services Deliverability • CRR Derating • Category 3: Must Be Fixed Over Time (within a few years • Scarcity Pricing • Category 4: Watch and Be Ready (if/when fix is needed) • Settlement at Shadow Prices • RUC and RUC Clawback • SCED and 2-Step Mitigation

  8. TAC Action Items • TAC Voting Items on other Parts of the Agenda • Shadow Price Caps and Power Balance Penalties in Security Constrained Economic Dispatch • WMS voted to recommend to NATF to adjust the Power Balance Penalty curve to begin at $500, go to 40MW, WMS to review in 2011. • Motion carried 61.1% for and 38.9% against with 7 abstentions • The Consumer segment Abstained.

  9. TAC Action Items • TAC Voting Items on other Parts of the Agenda • WMS Voting Structure • WMS recommendation that TAC adopt PRS voting structure for WMS, and limit e-mail voting to non-policy issues. • Motion failed 48.1% for and 51.9% against with 6 abstentions • Consumers voted in favor of the motion.

  10. TAC Action Items • TAC Voting Items on other Parts of the Agenda • COPS • Recommendation that does not disband COPS in 2011 and that WMS does not create Settlement Working Group in 2011. • Motion carried 74.1% for and 25.9% against with 6 abstentions • Consumers voted in favor of the motion.

  11. TAC Action Items • TAC Voting Items on other Parts of the Agenda • NPRR 272 • PRS tabled to allow WMS to provide better guidance at the regular PRS meeting in October. WMS will consider the NPRR at the October 20th meeting and has asked QSTF to review the language drafted at the Special WMS meeting on the 4th. • Recommend that TAC table until November

  12. Working Groups • DSWG • NPRR278, Emergency Interruptible Load Service (EILS) Modifications to Correct Self-Provision Settlement Equations, to Accommodate Advanced Metering Infrastructure, and other Clarifications • MCWG • Nodal Market Trial Credit Monitoring Management (CMM) Performance Discussion • Third Party Credit Administration – Other Markets • Report on Joint Meeting with CWG • Nodal Credit Readiness • CRR Credit Parameters (Presentations) • PSWG • General Update

  13. Working Groups • QMWG • General Update • Draft NPRR: Wind-powered Generation Resource (WGR) / Intermittent Renewable Resource (IRR) Base Point Deviation • Pending CEO Review (should be out this week) • CMWG– no report • VCWG– no report • MWG– no report • QSTF – no report • GATF – no report • WCATF– no report

  14. WMS GOALS

  15. QUESTIONS

More Related