An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENERGY PRODUCTION(OPERATIONS) Mark Studenic Energy Production Superintendent

  2. Operations – Maintenance Interaction • Operations: • Determines “what” and “when” for corrective maintenance • Leads daily production meetings • Initiates repair requests • Performs minor maintenance • Maintenance: • Determines “who” and “how” • Plans, schedules and executes maintenance work • Preventive/predictive maintenance • Most corrective maintenance • Outage management

  3. Operations - Staffing • Four rotating shift teams

  4. Operator Training & Development • Simulator sessions • Structured classroom training • On the job training • Written tests (monthly) • Enhance system knowledge • Coaching process • Operating procedure reviews (monthly) • Other • Business plan (annual) • New installations

  5. Equipment Check Sheets Daily Weekly Monthly Quarterly Annual Start-up/Shut down Outage Performance Measures Commercial Availability Dispatch Accuracy Communications Heat Rate NOx Reduction Performance Environmental Performance Safety Performance Knowledge Tests Disciplined Approach

  6. Performance Optimization Tools • PI (Process Information) • Trends • Scorecards • Operating procedures • Alarms/Annunciators • Personnel development processes

  7. Operations - Challenges • Aging workforce – loss of knowledge • Aging plant – increased system failures (cables, piping, etc.) • Training – new hires, new processes, new technology • Environmental performance optimization • Raising standards for excellence • Disciplined approach (check sheets) • Scorecards • Cycling units (units 1-4)

  8. Material Handling (Coal Yard) • Highlights: • Burn approximately 2.72 million tonne/year (3 million tons/year) • All coal received by train • Rapid discharge rail car unloader

  9. Rail Car Unloader • One of a kind in AEP System; 1995 • Completely automated • Unloads train at 3,356 tonnes per hour (3,700 tons per hour) • Train moves continuously at 0.48 Km/hour (0.3 MPH) • Equipped with top mount traveling rail car shaker

  10. Ash Utilization • Flyash- No commercial use • Unit 5 Bottom Ash • No commercial use • Used internally for dam construction and fill material • Units 1-4 Boiler Slag • 79% is processed and sold for roof shingles and sand blasting agent • 19% is sold to local townships for roadway ice control • 2% is stored on site as waste product • Cenospheres

  11. Chemical Lab • Highlights • Oxygenated feedwater treatment- unit 5 • Reverse Osmosis System- unit 5 • Circulating water copper corrosion inhibitor- unit 5 • Cycle water sample conditioning system • Caustic feedwater treatment- units 1-4 • On-line cycle water instrumentation

  12. Questions?