1 / 16

2010 Traffic Monitoring Workshop

2010 Traffic Monitoring Workshop. FHWA - Pooled Funds Speed Summit By: Kurt Matias February 23, 2010 kmatias@dot.state.ny.us. Why Join a Pooled Fund?. Allows for larger studies Allows for multi-State collaboration

vail
Télécharger la présentation

2010 Traffic Monitoring Workshop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2010 Traffic MonitoringWorkshop FHWA - Pooled Funds Speed Summit By: Kurt Matias February 23, 2010 kmatias@dot.state.ny.us

  2. Why Join a Pooled Fund? • Allows for larger studies • Allows for multi-State collaboration • Helps States avoid paying large amounts of money for quality research results • Facilitates improvement within the State-of-the Practice where States need it most • NY joined these studies using Research Bureau money

  3. FHWA Pooled FundNon-Intrusive Technologies Phase III • TPF – 5(171) • Began January 2009 • Lead State – Minn DOT • SRF Consulting awarded RFP bid • Current list of Study Partners: NY, CT, FL, GA, HI, IA, ID, IL, MN, MS, MT, OH, and TX

  4. NIT Phase III - Goals • Establish Ground Truth for Data Collection • Determine NIT Equipment Installation Limitations • Measure Sensor Technology Accuracies • Measure Limitations of NIT devices • Lighting • Occlusion • Weather • Improve accuracy of NIT devices

  5. NIT Phase III – Schedule • TAC Met for Kick-Off Meeting at Minn DOT – April 2009 • Ground Truthing – October 2009 • Field Work November 2009 – May 2010 • Final Report Due – June 2010 • Phase I and II Reports Available Online – • Phase I http://www.dot.state.mn.us/guidestar/1996_2000/nit1.html • Phase II http://www.dot.state.mn.us/guidestar/2001_2005/nit2.html

  6. NIT Phase III – Pooled Fund • Current Funding (limited) – $195,000 • Current list of Sensors to be included in the study: • Axle Light – Peek Traffic • TIRTL – Control Specialists Company • Wavetronix – Smart Sensor HD • Microloop – Global Traffic Technology • Mio Vision – Video Collection Unit

  7. NIT Pooled Fund in Action • Research Implementation: • Comprehensive results using the same testing methods for all sensors: • Ground truth results • Various test environments – high volume, low volume, and varied weather conditions • State DOT’s will have improved knowledge of each tested sensor and can better use each technology • Known sensor features and limitations • Improved methods for traffic data collection using NIT

  8. FHWA Pooled FundLoop/Length Based Vehicle Classification • TPF – 5(192) • Started January 2009 • Lead State – Minn DOT • Consultant Contractor – SRF Consulting • Study Partners: NY, AK, CT, FL, ID, IL, MI, MN, OH, PA, TX, WA, WI and WY

  9. L/LBVC - Goals • Establish loop specifications for optimum length based accuracy • Determine number of length bins and sizes that will work with different technologies across different States • Research Tasks: • Loop size, shape, installation techniques… • Optimization of length bins – number and vehicle size • Determine the accuracy of LBVC • Find causes of inaccuracies and methods to avoid them • Testing some non-loop based equipment

  10. L/LBVC - Schedule • TAC Met for Kick-Off Meeting at Minn DOT – April 2009 • RFP bid awarded to SRF Consultants – October 2009 • Literature review – November 2009 to May 2010 • Meeting at NATMEC – June 2010 • Field installations and data collection – 2011 • Study completed – June 2012

  11. L/LBVC - Pooled Fund • Current Funding (limited) - $425,000 • Expected Results: • Establish best loop installation practices to improve length based classification measurements • Define number of bins and the thresholds for each bin to make length based data transportable between technologies, vendors and States • Determine the length based accuracy for various technologies • Determine the criteria to obtain the best possible length based measurements

  12. L/LBVC Pooled Fund in Action • Research implementation: • Establish standard for number and size of each length bin • Determine the accuracy of length based measurements and what methods will improve results • Determine the optimum loop layout that will lead to improved accuracy and better length based data

  13. FHWASpeed Data Summit Meeting • 18 states participated: PA, GA, CA, MT, AZ, ID, OH, MN, TX, VA, IN, NY, ME, FL, WA, CO, WA, and MD • Including FHWA, CUTR, and Federal Safety folks • Summit kick-off held at CUTR in Tampa, FL on Nov. 3-4 • Discussed some states speed data programs (FL, NY, OH and PA): • Collect data by direction/lane • Binning schemes • Reporting methods

  14. Speed Summit in Action • Consensus on common database structure to collect and store speed data: • By lane • Every 15 minutes (preferred) every hour acceptable • In 5 MPH bins • First bin ≤ 20 MPH • Report in 5 MPH increments • Last bin at least 85+ MPH • Identify count location by Lat/Long

  15. Speed Data Summit • Implementation: • Draft Speed Data chapter for the TMG – February 2010 • Collect speed data from a few participating states • Continue to Develop and refine Speed Data QC checks • Add speed data requirement to TMG • TMAS (Travel Monitoring Analysis System ) 3.0 will require states submit speed data via the web to FHWA

  16. Thank You!!! For Additional Information Contact: Federal Highway Administration Steven Jessberger – Pooled Funds 202-366-5052 steven.jessberger@dot.gov Harshad Desai – Speed Summit 404-562-3576 harshad.desai@dot.gov

More Related