valentine-lawrence
Uploaded by
6 SLIDES
142 VUES
60LIKES

Resilient Emergency Services Operations Center for Efficient Collaboration

DESCRIPTION

A state-of-the-art emergency management hub on a 152-acre site ensures durability, expansion flexibility, and fusion services for 120 individuals. Strategic location with access to local roads and utilities.

1 / 6

Télécharger la présentation

Resilient Emergency Services Operations Center for Efficient Collaboration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Project Attributes • Site Selection • Site selected on Inner Loop Road South east of the Justice Center and Animal Control Facility • 152-acre site that meets all FEMA and DoD setback and land use/ buffer separations • The selected site offers the best options for long-term use and flexibility • Excellent access to local street and freeways • Good proximity to utilities – although new utilities (power, sanitary and storm water) will be required • High pressure gas line running through the site that will require design mitigation (separation via easement)

  2. Project Attributes • Emergency Services Operations Center • 27,300 GSF for emergency management services • Fusion services (combining of various departments to collaborate in the event of an emergency) is a leading-edge concept • House nine departments or departmental elements – largest users are Communications and Emergency Management • The building can support approximately 120 persons for 3 to 4 days in the event of a significant event • The building will be a durable facility to withstand intense weather events – includes redundant power back-up • Building will be designed and constructed to be easily expanded and several add-alternates will be provided during design for maximum budget efficiency

  3. Departmental Elements • Computer Aided Dispatch (CAD) • Sheriff (LT. and SGT.) • 911 Communications • Plans • Emergency Management • Hazardous Materials • Logistics • Texas Law Enforcement Communications System (TLETS) • WCC Health Department • GIS • IT

  4. Add Alternate No. 1 4800 GSF Add Alt No. 2 1500 GSF CoreService OfficeFunction ConferenceMulti-purpose SecureEntry Zone Support Utility Entry

  5. Milestone Schedule