Deem Al- Hajaj Madawi Al- Afaliq. Scope Management and Integration Management . Work Breakdown Structure. 1.0 Develop Course Curriculum 1.1 Course material outline 1.2 Course material content 1.2.1 Survey on most required computer skills 1.2.2 Appropriateness to the level of trainees

1 / 10

Télécharger la présentation

Scope Management and Integration Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Deem Al-Hajaj Madawi Al-Afaliq Scope Management and Integration Management

  2. Work Breakdown Structure • 1.0 Develop Course Curriculum • 1.1 Course material outline • 1.2 Course material content • 1.2.1 Survey on most required computer skills • 1.2.2 Appropriateness to the level of trainees • 1.3 Course material suggestions • 1.3.1 Search for appropriate books in bookstores • 1.3.2 Search for appropriate material online • 1.3.2 Decide on a book or downloaded documents that would cover • the planned material to be taught • 1.4 Approval of suggested course material • 1.5 Material printing or buying • 1.6 Determining course duration • 2.0 Admission and Registration • 2.1 List of interested trainees • 2.2 Assessment • 2.2.1 Level of need • 2.2.2 Level of education • 2.2.3 Level of IT knowledge • 2.3 Choosing Trainees

  3. Cont WBS • 3.0 Recruiting Trainers • 3.1 Evaluating qualifications • 3.2 Interviewing • 3.3 Selection • 4.0 Facility Set-up & Maintenance • 4.1 Procuring office supplies and workers • 4.2 Developing Course schedules • 4.2.1 Divide course into sections • 4.2.2 Develop section time schedule • 4.2.3 Develop section location schedule • 4.2.4 Assign trainers for each section • 4.2.5 Assign trainees for each section • 4.3 Get approval on schedules • 4.4 Reservations of buses and classes • 4.5 Maintaining and setting-up computers

  4. Cont WBS • 5.0 Evaluating & Certifying Trainees • 5.1 Assessing gained knowledge • 5.2 Assigning scores • 5.3 Reviewing score • 5.4 Printing certificates • 5.5 Signing certificates • 5.6 Submitting certificate • 6.0 Follow-up on Former Trainees • 6.1 Contact former trainees • 6.2 Provide support and help • 6.3 Offer advanced courses • 6.4 Offer job recommendations

  5. Cont WBS • 7.0 Sponsoring Campaign • 7.1 Internet based Campaign • 7.1.1 Create and maintain a Twitter account • 7.1.2 Create and maintain a Facebook page • 7.1.3 Create and maintain a Blog • 7.2 Field based Campaign • 7.2.1 Design Materials • 7.2.1.1 Design Posters • 7.2.1.2 Design Flyers • 7.2.2 Print Materials • 7.2.2.1 Print Posters • 7.2.2.2 Print Flyers • 7.2.3 Distribution of Material • 7.2.3.1 Locate Posters on important locations • 7.2.3.2 Distribute Flyers • 7.2.3.2 Set up a Booth

  6. Proposal

  7. Scope Statement

  8. Cont Scope Statement

  9. Project Charter

  10. Cont Project Charter