1 / 2

Overall Plan for 100 GeV run

This document outlines the overall plan for the upcoming 100 GeV run, detailing key priorities at the end of Run-9. It addresses understanding limitations of store lifetime at 100 GeV and discusses the development of the 'near-integer' ramp for pp collisions at 250 GeV. Additional topics include the set-up for pp2pp collisions, advancements in 0.5m beta* for 250 GeV, yellow ramp transmission concerning intensity limits, potential removal of beam-beam wires during the shutdown, and considerations for stochastic cooling techniques.

verity
Télécharger la présentation

Overall Plan for 100 GeV run

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overall Plan for 100 GeV run

  2. APEX Priorities – end of Run-9 • Understanding store lifetime limitation (100 GeV) • Development of the ‘near integer’ ramp for PP 250 GeV • Set-up for pp2pp • 0.5m beta* development for PP 250 GeV • Yellow ramp transmission – intensity limit • Beam-beam wires (will be likely removed during shut-down) • Stochastic cooling ?

More Related