An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. End of contract – Various project’s status updates GeorgiosKonstantinou 16.12.2013

  2. Status of projects • Links (~1010 BER over 20 m CAT6 cable) • Small upgrades possible (Phase word setting, longer reset periods, longer/safer initial phase scanning) • Web testing • Few more webs for testing, improvement of web quality • Test for noise behavior on detector and over time under way • Cover testing • Different tests led to confirmation of design and system quality (threshold baseline, noise, TDC resolution etc.) • Poster participation at TWEPP 2013 (proceedings pending)

  3. Status of projects • Queuing simulations • Different versions for different syntaxes (24bit, 32bit) • Encouraging results about data rates • Possibility for data compression with packets (under study) • Easy-to-use-and-adjust VHDL test benches could prove useful for further research of the subject • Front end remote programming • Library and firmware ready (under debugging) • Software under construction

  4. End of contract • Participation in the group since October 2011 • Worked in building hardware, firmware and software for a new read out system • Worked in quality testing for electronics • Involvement in installation of detector • Implementation of systems and support for Dry run and Technical run (2012)

  5. End of contract • Learning since October 2011 • Radiation protection • Working with high voltage in industrial environment • Working at heights • Essential principles of signal integrity • Different courses, presentations and workshops for FPGA design/ PCB design • Participation with a poster at TWEPP 2013: Performance evaluation of multiple sub-nanosecond TDCs implemented in low-cost FPGA

  6. Useful links • Documentation and software (simulations/analysis) • \DFS\Departments\PH\Groups\TA1\NA62\Georgios • Software (data acquisition, front end control and testing) • /afs/cern.ch/user/s/strvme/giorgios • Twiki page of straws • https://twiki.cern.ch/twiki/bin/viewauth/NA62/StrawDetector • Personal email • yoconst@gmail.com

  7. The End Thank you, Questions?