1 / 11

Muller systems assembly line optimization

Muller systems assembly line optimization. MGMT 5060 – Harvard University Prof. Paul Tumolo Team MAT Maria Hevia Nick Dion Fatih Avci Chaitanya Misal. Mueller Systems. Smart Metering Solutions Increase Efficiency Reduce Cost Improve Customer Service. Electricity. Gas. Water.

wauna
Télécharger la présentation

Muller systems assembly line optimization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Muller systems assembly line optimization MGMT 5060 – Harvard University Prof. Paul Tumolo Team MAT Maria Hevia Nick Dion FatihAvci Chaitanya Misal

  2. Mueller Systems • Smart Metering Solutions • Increase Efficiency • Reduce Cost • Improve Customer Service Electricity Gas Water

  3. Mueller Systems Data is communicated wirelessly from meter to the mobile unit Data is transferred from mobile unit to data server Mobile Data Collection AMR Hot Rod - Device of interest Municipal data server Meter

  4. Product Overview • AMR Hot-Rod (radio transmitter unit) • Highest selling product for Mueller • Unchanged assembly line for last 10years Shipped to USA Circuit Board CHINA Unit Assembly MEXICO

  5. Current Assembly Process Remove latex from board Solder antenna to the board Push wires and seal openings with epoxy Stn. 1 30 30 45 Solder battery Solder wires Assemble unit Test and label the unit Stn. 2 30 10 25 60 Potting – Seal unit with epoxy Stn. 3 50 Vacuum units to remove air bubbles (Batch of 5 units) Seal Units (O-ring) Final quality test Epoxy Curing Stn. 4 150 150 Note: Each color represents one worker

  6. Metrics for current process COST Per unit cost: $3.08 Cost /year: $409,640 First Pass Yield: 97% QUALITY 5 hand-offs DELIVERY Capacity/Year: 133,000 units (48 hour work week) 6 Line Workers Cycle Time: 65 seconds Idle time: 90 seconds

  7. Suggested Improved Process Remove latex from board Solder antenna to the board Push wires and seal openings with epoxy 30 30 45 Stn. 1 Remove latex from board Solder antenna to the board Push wires and seal openings with epoxy Solder battery Solder wires Assemble unit Test and label the unit Stn. 2 30 10 30 25 Solder battery Solder wires Assemble unit Test and label the unit Potting – Seal unit with epoxy Potting – Seal unit with epoxy Stn. 3 50 50 Vacuum units to remove air bubbles (Batch of 4 units) Seal Units (O-ring) Final quality test Epoxy Curing Stn. 4 120 120

  8. Improved metrics COST Per unit cost: $2.84 Savings $34,000 First Pass Yield: 97% QUALITY 3 hand-offs DELIVERY Capacity/Year: 144,000 units (48 hour work week) 6 Line Workers Cycle Time: 60 seconds Idle time: 25 seconds

  9. Net value of improvement • Potentialpricereduction: $0.24/unit(negotiable) • Potentialsavingsup to: $34,000/year • Cycle Time reductionby: 5 seconds • Increasethroughputby: 11,000units/year • No changein number of workersorworkinghours • Reducehand-offs, potentiallyimproveFPY • 200 fewerhoursrequiredto produce theoriginal output (133,000 units/year) • ReducedIdle time from 90 secondsto 25 seconds • Investmentment of 1 extra test computer

  10. Our Suggestions • Option 1: • Mueller continues buying 133,000 units/year (Number equals the output old process) • New process can produce them in 200 fewer hours • Mexican facility can use this free time to take other clients orders • Negotiation per unit ($2.84/unit vs. $3.08/unit) • Potential savings up to $34,000 per year • Option 2: • Mueller buys 144,000units/year (Total output with newer process) • Negotiation per unit ($2.84/unit v. $3.08/unit) • No change in number of workers or work duration • Potential savings up to $34,000 per year • Mueller and Mexican facility should share the savings in order to leverage process improvement • Mueller can also negotiate to pay per hour instead of pay per unit to leverage any further improvement in process