1 / 6

Planned Mitigations at the ESS Test Stand 2

Planned Mitigations at the ESS Test Stand 2. Wolfgang Hees TS2 Machine Section Coordinator. 2019-05-21. TS2 mitigations. installation of a fast relieve valve installation of a quench detection system (RF). installation of a fast relieve valve. installation of a fast relieve valve.

woodsc
Télécharger la présentation

Planned Mitigations at the ESS Test Stand 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planned Mitigations at the ESS Test Stand 2 Wolfgang HeesTS2 Machine Section Coordinator 2019-05-21

  2. TS2 mitigations installation of a fast relieve valve installation of a quench detection system (RF)

  3. installation of a fast relievevalve

  4. installation of a fast relievevalve M0 (MECCTD) Series

  5. installation of a fast relievevalve M0 (MECCTD) SVC91: Velan, SCRG 02 ZD 197 F DN25x20 on-off valve triggered by PT03

  6. fast relievevalve SCV91 PT03 0-10 V In control rack

More Related