Today’s Thoughts

DESCRIPTION

Today’s Thoughts. If you shoot at nothing, you will surely hit it. A successful person is goal oriented. A person who cannot see the ultimate will become slave to the immediate. CON 371 - Project Management and Safety . Project Scheduling 17 September 2001. Project Management.

1 / 23

Télécharger la présentation

Today’s Thoughts

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Today’s Thoughts • If you shoot at nothing, you will surely hit it. A successful person is goal oriented. • A person who cannot see the ultimate will become slave to the immediate

  2. CON 371 - Project Management and Safety Project Scheduling 17 September 2001

  3. Project Management

  4. Why ProjectPlanning? • To think it through on paper • Method, time, resources • Identify problems and opportunities • Do not have to commit resources first • Gathering Information (planning) reduces risk

  5. Why ProjectPlanning? • Establish a framework • Measuring • Reporting • Controlling • Main parameters of the problem • What • How and when • First and next

  6. Scope Definition • What work is to be done? • Fixed Price - well defined with contract • Design/Build - may be more open • Services to be performed • Documents to be produced • Description, Responsibilities, Available Material, Decisions made

  7. Safety Budget Completion Time Reliability of operations Quality Security Use of local suppliers Use of local subcontractors Maintainability Project Objectives to consider during Scheduling

  8. New Technology Prototype Equipment Site Conditions Resources Permits Access Labor Economic conditions Startup of Complex systems Material delivery and storage Identify Unique ProblemsHow do they affect the schedule?

  9. Project StrategyImplemented thru the Schedule • Project objectives - ultimate destination • Project Strategy - general direction and how to get there, sequencing • Planning - implementation of strategy • specific work packages, schedule • What-if scenarios

  10. ConstructabilityImpact on the Schedule • What is the best way to construct this project? • Arrangement of laydown yards, sequence of construction, construction techniques • Start as early in the life cycle as possible

  11. Scope Objectives Assumptions Constraints Pending Decisions Alternatives Unique Problems Execution Strategy Staffing Work elements Project plan Schedule Budget Closeout Execution Plan

  12. Performance Assurance Plan • Project Monitoring • Schedule • Budget • Productivity • Quality • Determine baselines • Frequency of verification • Feedback

  13. Project Logic • Start planning the sequence of work • Initial operations • site layout, temp utilities, labor, modularization • Construction • order of field work, material delivery, testing and startup, • Priorities • Support for sequence, procurement

  14. Task Identification Sequencing Logic Diagram Staffing Analysis Activity Durations The Critical path Resource Profile Resource Leveling Scheduled Plan Bar (Gantt) Charts Scheduling the Work

  15. Network Logic • Sequence of Activities • Predecessors, Successors, Concurrent • Depends on method of construction • Restraints (Constraints) • Space • Resource • Equipment

  16. Project Scheduling • Activity Duration • Deterministic • Probabilistic • Estimating Durations • Scheduling Calculations • Forward Pass • Backward Pass • Critical Path • Float • Resource Leveling

  17. Exterior siding Clear site Rough walls and floors Excavate basement Pour basement Roof Rough-in plumbing Finish Electrical Finish plumbing Interior painting Wallboard Exterior fixtures Exterior paint Finish flooring Roofing Landscaping Rough-in Electrical Precedence Example Arrange the activities according to precedence requirements.

  18. Clear site Excavate basement Pour basement Rough walls and floors Roof Rough-in plumbing Rough-in electrical Exterior siding Roofing Wallboard Interior painting Finish Electrical Finish flooring Finish plumbing Exterior paint Exterior fixtures Landscaping Precedence Example The activities arranged for one possible solution.

  19. Gantt or Bar Chart Easy to construct Easy to understand Milestone chart Quick view of project status Scheduling Methods

  20. Bar Chart Example

  21. Gantt or Bar Chart Easy to construct Easy to understand Milestone chart Quick view of project status CPM Sequencing of Tasks Interdependence of tasks Monitor and control Critical path “What if” analysis Time and resource constraints Scheduling Methods

  22. Project SchedulingLogic time-scaled bar chartStart, Finish, Float

  23. The Schedule Plan • Establish Objectives • Develop Work Breakdown Structure • Plan the Project • Assign durations • Assign resource requirements • Optimize sequencing