html5-img
1 / 17

Project Charter

Project Charter. DEFINE. Project Charter. DEFINE. Project Timeline. DEFINE. Tools Used. DEFINE. Process Map. DEFINE. SIPOC. DEFINE. S uppliers. I nputs. P rocess. O utputs. C ustomer. UNCONTROLLABLE PARAMETERS Breakdowns Stores Orders Machine Type Floor Layout.

yen
Télécharger la présentation

Project Charter

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Charter DEFINE

  2. Project Charter DEFINE

  3. Project Timeline DEFINE

  4. Tools Used DEFINE

  5. Process Map DEFINE

  6. SIPOC DEFINE Suppliers Inputs Process Outputs Customer • UNCONTROLLABLE PARAMETERS • Breakdowns • Stores Orders • Machine Type • Floor Layout Ingredients Warehouse • INPUTS • Ingredients List • Bakery Ingredients • Mixer Settings • Divider Settings • Freezer Settings • Packaging Materials • Labeling Settings Shipping • OUTPUTS • Packed Frozen Wheat Deli Sub • Packed Frozen White Deli Subs Deli Subs Production Wegmans Frozen Warehouses Primary Distributors Secondary Distributors • PROCESS CONTROLS • Ingredients Batching and Mixing • Machine Settings • Machine Staffing • Daily Schedule execution • DEFECTS • Forming Quality • Product Consistency Wegmans Stores

  7. Fishbone Diagram MEASURE

  8. Data Collection MEASURE • Existing Mezzanine Tracking Sheet (Packing Operation Start and End Time, Case Count) • Existing Mixing Schedule (Unload Time • New Form for Remix, Scrap & Breakdown • Time Study of Mixing and Packing Processes • QA Test Results • Artisan Process Control Recommendations

  9. Results Overview ANALYZE

  10. Improvement Axis ANALYZE

  11. Mixing Axis ANALYZE • Simulate Process • Evaluate Ergonomically • Improve Process

  12. Remix and Scrap Axis ANALYZE • Process Quality Parameters • Recommended Settings • Possible adjustments

  13. Slide Title IMPROVE Coming Up Next ! Thanks for your Attention

  14. Slide Title CONTROL (Add Control Tools and Update Slide Title) Takeaway:What are the takeaways?

  15. Slide Title CONTROL (Add Control Tools and Update Slide Title) Takeaway:What are the takeaways?

  16. Potential Future Project List CONTROL

  17. Tips and Hints • Complete the page 1 of Project Charter for new projects • Finish page 2 by the end of the Define phase • Tell a “Story” with the presentation – walking the audience through your process with major takeaways at each step. • Copy and paste the Takeaway kicker box at the bottom of this page to highlight items for slides • Insert new slides, as necessary, for each phase • Keep the Gantt Chart and Tools Used slides up to date • Compress pictures used in presentation to minimize file size • List Potential Future Projects as they are discussed in project work Takeaway:What are the takeaways?

More Related